- Member since
January 2004
- From: Brisbane Australia
|
Posted by ChrisJH666
on Monday, December 26, 2022 1:04 AM
Just to prove this is still moving forward, progress is slow, but still progress. All the frame clamps for the right hand side switch boxes, etc, are now complete and painted. Each of them has been on the floor at least twice, and one had to be replaced completely the original couldn't be found ....... then that one had to find the floor a couple of times! At least my very simple but fidly jig to drill the holes worked.
In the queue: 1/48 Beech Staggerwing (RAAF), P38 (RAAF), Vultee Vengeance (RAAF), Spitfire Vb (Malta), Spitfire VIII x2 (RAAF), P39 x2 (RAAF), Martin Baltimore (Malta?), Martin Maryland (Malta), Typhoon NF1b, Hellcat x2 (FAA)
Chris
|