- Member since
June 2012
- From: Anniston, AL
|
Posted by GAF
on Wednesday, January 9, 2019 10:30 PM
Gamera> Nah! I'd never confuse you with Bakster...
Mach71> Hey, welcome back! I understand about other things getting in the way of bench time. Glad to see you're good, though. After my bout with the flu last month, I do wonder about people's absences.
The Mercury is looking good, and I do see some minor differences in the straps. I think a few minor pieces of cardboard would correct the problems, but that's just me. Unless you had pointed it out, I don't think anyone would have noticed.
Project Report:
A lot more minor prep work tonight, as I wrapped the Instrument Unit antenna in white vinyl electrical tape and sanded down the RCS units for the Service Module. Amazing how much time that takes. I am pleased with how the antenna came out, and promise a photo next time when I've made more progress. Meanwhile, I'm considering how to handle the interior of the Command Module and am considering some printed panels to go in the crew compartment. I think I have some nice interior CM layouts in my collected images.
On the other hand, I really need some information on the lower part of the LM Storage Area, and the images I've managed to find online don't really cut it. In that regard, I'm considering a trip up to Huntsville to visit the Space and Rocket Center later this month. I haven't been there since the early 70s, so it's about time for another. (It's less than a 2 hour drive.)
Should be interesting.
Mission Director (GAF)
Today in Space History:
1948 January 9 - .
- XS-1 Flight 63 - . Crew: Lilly. Payload: XS-1 # 2 flight 25. Nation: USA. Related Persons: Lilly. Class: Manned. Type: Manned rocketplane. Spacecraft: XS-1. NACA flight 5. Pilot familiarization..
1959 January 9 - .
-
The Source Selection Board at NASA Headquarters composed of Abe Silverstein, Ralph Cushman, George Low, Walter Schier, DeMarquis Wyatt, and Charles Zimmerman, completed their findings and reported to Dr. T. Keith Glennan, the Administrator. McDonnell Aircraft Corporation was selected as the prime contractor to develop and produce the Mercury spacecraft.
1961 January 9 - . LV Family: Nova. Launch Vehicle: Nova 4L.
- First meeting of the Manned Lunar Landing Task Group - . Nation: USA. Related Persons: Silverstein. Program: Apollo. Spacecraft: Apollo CSM, Apollo Lunar Landing, CSM Source Selection, LM Mode Debate, LM Source Selection.
At the first meeting of the Manned Lunar Landing Task Group, Associate Administrator Robert C. Seamans, Jr., Director of the Office of Space Flight Programs Abe Silverstein, and Director of the Office of Advanced Research Programs Ira H. Abbott outlined the purpose of the Group to the members. After a discussion of the instructions, the Group considered first the objectives of the total NASA program:
- the exploration of the solar system for knowledge to benefit mankind; and
- the development of technology to permit exploitation of space flight for scientific, military, and commercial uses.
NASA's lunar program was a logical step toward these objectives. In current lunar program planning, three steps were projected:
- a manned landing on the moon with return to earth,
- limited manned lunar exploration, and
- a scientific lunar base.
To accomplish the first step, a great increase in launch vehicle capability would be needed beyond that provided by current funding. A comparison of a three-million-pound-thrust and a six-million-pound-thrust Nova launch vehicle was made. It was estimated that a 60,000- to 80,000-pound payload to escape velocity would be needed for a manned lunar landing mission.
1965 January 9 - .
- Cosmonaut recruitment - . Nation: Russia. Related Persons: Korolev, Kuznetsova, Ponomaryova, Solovyova, Tereshkova, Yerkina. Program: Voskhod. Flight: Voskhod 5. Spacecraft Bus: Vostok. Spacecraft: Voskhod.
Kamanin would like to get going with the training of 40 additional cosmonauts from many disciplines in order to 'storm space'. Korolev is opposed. Kamanin is also trying to get new flights scheduled for his female cosmonauts. This is never mentioned in the planning of future flights. Korolev is opposed to sending any further women into space. Kamanin would like to see a two-woman Voskhod flight, or a woman making a spacewalk. Aside from Tereshkova, Ponomaryova and Solovyova are as qualified and talented as any of the male cosmonauts for such flights. Yerkina and Kuznetsova, although they have completed the course, are ruled out by weaknesses in technical areas or character, in Kamanin's opinion.
1968 January 9 - .
- Budgetary restraints required additional cuts in AAP to three Saturn IB and three Saturn V launches. - . Nation: USA. Spacecraft: AES Lunar Base, ALSS Lunar Base, Orbital Workshop, Skylab.
NASA budgetary restraints required an additional cut in AAP launches. The reduced program called for three Saturn IB and three Saturn V launches, including one Workshop launched on a Saturn IB, one Saturn V Workshop, and one ATM. Two lunar missions were planned. Launch of the first Workshop would be in April 1970.
1969 January 9 - . Launch Vehicle: N1.
- State Commission for the first N1 launch - . Nation: Russia. Related Persons: Afanasyev, Sergei, Kurushin. Program: Lunar L3, Lunar L1. Spacecraft Bus: Soyuz. Spacecraft: Soyuz 7K-L1A.
The State Commission for the first N1 launch, headed by Afanasyev, convenes at Area 12 of Baikonur. All of the Chief Designers and top generals of the VVS are in attendance. Many defects are identified in the review, but there seem to be no show-stoppers. Payload integration with the booster is to begin 13 January and launch by 18 February. Then Baikonur commander General Kurushin drops a bombshell - he declares he is not prepared to attempt to launch this 'unready' rocket. Much argument and discussion ensues. Finally Afanasyev asks that the issues raised be reviewed, in preparation for the next commission meeting on 11 January.
1971 January 9 - .
- VVS Reviews TsKBM Facilities and Programs - . Nation: Russia. Related Persons: Chelomei, Mishin, Ustinov. Program: Almaz, Salyut. Spacecraft: Almaz OPS, Salyut 1.
The VVS leadership visits Chelomei's facility at Reutov. Kamanin recalls first seeting the Almaz mock-up five years earlier - it was already fully defined then. But it was only in August 1970 that a resolution was issued setting a firm schedule: Chelomei was to start flight trails in the second half of 1971, and the station was to enter service in 1972. Mishin is proposing to cancel Almaz and build 10 DOS stations instead. Mishin currently supervises five design bureaux, 60,000 workers, and is working on Soyuz, 7K-S, L3, DOS-7K, and a very few other projects. Chelomei has only one design bureau and 8,000 workers. Yet he has produced well-designed, mass-produced cruise missiles for the Navy, over 1,000 ICBM's for the RVSN, and the high-quality UR-500 Proton launch vehicle. Almaz could have flown on time if Ustinov had allowed Chelomei just 10% of the resources he has let Mishin squander on DOS. Chelomei easily agrees with the VVS to a mutual schedule for Almaz crew training, crew composition, etc. The contrast with the argumentative Mishin couldn't be greater.
1994 January 9 - .
- Mir News 202: Soyuz-TM18 blasted off for flight to Mir - . Nation: Russia. Program: Mir. Flight: Soyuz TM-17, Soyuz TM-18, Soyuz TM-18 Mir LD-4.
Soyuz-TM18 has been launched from Baykonur on 8.01.94 at 1005 UTC. All went well and at 1014 UTC Soyuz-TM18 had reached the right orbit. For the flight the 1st crew had been selected, so: Captain V. Afanasyev, who makes his 2d flight, board engineer (rookie) Yu. Usachev (pronunciation Usachov ) and the physician Dr. V. Polaykov, making his 2d flight. He will try to remain 427 days in space. The call of the crew is Derbent, so resp. Derbent-1, 2 and 3. For radio-amateur traffic resp. U9Mir, R3Mir and U3Mir. Soyuz-TM18 came in range during orbit 3, 1307 UTC. Strong transmissions on the known frequencies (121.750, 165.874 and 922.755 mc). Afanasyev reported that all went well and he added some pressure values. After abt. 30 mins Mir (orb. 45114) could be heard here. TsUP told the Mir-crew that all on board Soyuz-TM18 was normal. In the pass in the 4th orbit (1436 UTC) Afanasyev reported that the Soyuz-TM18 executed 2 orbit corrections without significant problems. During the pass in the 5th orbit (1609- UTC) Afanasyev reported the successful performance of Soyuz-TM18 during the 3d orbit correction. Afanasyev got the order to adjust the Globus position indicator and Dr. Polyakov stated that the condition of the crew was excellent. On 10.01.94 at 1150 UTC Soyuz-TM18 has to dock to the Mir-complex. This will be abt 4 mins. after LOS of the space objects in Mir's orbit nr. 45144.
Chris v.d. Berg, NL-9165/A-UK3202.
2001 January 9 - . 17:00 GMT - . Launch Site: Jiuquan. Launch Complex: Jiuquan SLS. LV Family: CZ. Launch Vehicle: Chang Zheng 2F.
- Shenzhou 2 - . Mass: 7,400 kg (16,300 lb). Nation: China. Agency: CASC. Manufacturer: CALT. Class: Manned. Type: Manned spacecraft. Spacecraft: Shenzhou. Duration: 6.77 days. Decay Date: 2001-01-16 . USAF Sat Cat: 26664 . COSPAR: 2001-001A. Apogee: 345 km (214 mi). Perigee: 330 km (200 mi). Inclination: 42.6000 deg. Period: 91.30 min.
The second unmanned test flight of the Shenzhou manned spacecraft design carried a monkey, a dog and a rabbit in a test of the spaceship's life support systems. Shenzhou 2 was the first test of an all-up flight model of the spacecraft, with a functioning orbital module. It was also the most ambitious space science laboratory ever launched by China. It carried 64 scientific payloads: 15 in the re-entry module, 12 in the orbital module and 37 on the forward external pallet. These included a micro-gravity crystal growing device; life sciences experiments with 19 species of animals and plants, cosmic ray and particle detectors; and China's first gamma ray burst detectors.
The launch was originally scheduled for January 5, but the second stage of the launch vehicle was dented by an access platform while being prepared for roll-out in the vehicle assembly building. This caused several days of delay until it was cleared for flight. Shenzhou 2 made three orbit-raising manoeuvres during its flight, reaching a 330 x 345 km orbit by the end of the initial phase of the mission. Ninety minutes before landing the orbital module depressurised, and the spacecraft went briefly out of control. However this was regained after venting of the atmosphere from the module ended. The descent module and service modules separated from the forward orbital module and external pallet normally. After retrofire by the service module, it separated and the descent module landed at 11:22 GMT on January 16 in Inner Mongolia. Lack of post-recovery photographs led to speculation that the recovery may not have been completely successful. The Shenzhou orbital module had its own solar panels and remained operational in orbit, conducting scientific experiments. It was actively controlled for six months, maneuvering in orbit several times (reaching a final orbit of 394 x 405 km). It then was allowed to decay and reentered the atmosphere at 09:05 GMT on August 24, 2001. The reentry point was near 33.1 deg S in latitude and 260.4 deg E in longitude, over the western Pacific Ocean between Easter Island and Chile.
|