I can't believe the last time I posted was in May! Holy cow!
Anyway, I have a small update today. Just to show that I haven't been exactly sitting on my hands all summer.
I bit the bullet, pulled my CC AH-1W set out, and commandeered the exhaust set. Once LSM gets going again, I'll just buy a new set for my (future) AH-1W.
Since my fuselage was already glued together, I used the -1W parts to measure out where I needed to make my cuts.
Overall, it went in pretty well. I think it would have fit better if I had made the cuts before glueing the fuselage halves together.
I also worked on the stub wings. The original demonstrator had the Sidewinder rails attached to the top of the wings. Italeri's -1Z boxing offers both tip and top mounted rails. I used the top mounted rails but drilled a hole through to the wing. A piece of wire runs through the rail to the wing and extends a bit out of the top. That will provide a little rigidity and strength to the assembly as well as give me an attachment point for the Sidewinder.
Here are things just kind of slapped together to see how they look. Next will be replacement of the missing raised detail and primer.
Hopefully it won't be another 3 months between posts. Anyway, for now, feel free to share you comments, questions, and/or criticism.
Thanks for looking!
-O