Dwight- Which of the four do you think you'll finish first? Is the Hulk based on the old show, movie, or the comic book directly?
Chris-lots of work yet to do+Learning to draw the line (a ruler helps)
ATTN no one mention anything good to Monsterarmor and if he does get wind of something good we have to buy them all up to save him!
So MadMF is it really gonna be easier to move fragile models or unbuilt kits? I'd think the kits would be easier unless you don't keep all the built models(gifts, museum, an ordered one for someone).
Nicely said Keyworth.
No It's not done,Dave, but I did cut the pieces for the collar and washed them. They should be dry for tonight. Hey I have dibs on this planet. Find one for yourself. You and Paul need to get busy. Raising an army is no easy thing. Several is a real challenge.
What'd you do now tigerman? I'll have to check that thread.
SWEET! Trevor, did you mix and match parts for Murphy or does some company make a kit? Good luck on the Sherman but Murphy will be waiting..
Cute, Eric. No don't take that as a complement. Yes on the short attention span. No on the bad memory(I've memorized over 700 episode titles for Star Trek in order along with a short abstact of each.) You should see my planner-a list of every meeting assignment and chore, Weds. includes the Episode title of Enterprise and all the big tasks are itemized. I'll check in on Mondays.
What scale and make of firetruck, lizard Chris
?
This year you'll start the leopard and next year you'll finish it. right? 3ggs
Interesting system nicholma
Another no buying one from the Hulk. IN THE NEGITIVE. (
?)
Another 4 kit club from U96.
Added after original run down:
Frosty will be working on five projects.(Have to one up the boys don't you
)
Bruce will be placing 178 plates on a hull, starting a hull, and cutting out parts.
Reggie's gonna swat his Mosquito off heis to do list.
Elkin got a full list of habit breaking, habit makeing, and a little storage project.
V wants to finish his catalina and start his Flying fortress.
1st lady-done bug, plane and tank.
Bandit Dave-Got a kingfisher to finish, and will be playing doctormad scientist by creating 2 monsters.
paulnchamp-Build more than last year.
LeeTree-Build some of his kit backlog.
Balta1-build 1model per month
M1 wants to keep up with his group builds.
Lakota is swearing of new kits till nationals and building 6 kits for it.
TheZERO has a long list and enough ambition to humble. Good luck with that.
jlwilliams wants to build a kit a month-WELCOME to the forum btw
thyamis wants to limit his buying to 12 kits and build his backlog of kits.
Robert wants to build something other than a sherman this year.
Mark wants to clear the back log of unbuilts too.
Tango 1 hopes finsh those lingering projects.
Jon wants to focus on one at a time.
kaleu hopes to do four projects AND organize the hobby room
smitty has 4 cases of modelers block to kill
kik is being very ambitious, let's seen where it goes
Mike's got several kits to finish. Don't we all.
Pics must be had from all.