Here are the panels that I've gotten done so far ... and an up-close look at a near-finished panel w/ the original. I think the biggest difference is the look around the window slots ... I think it looks MUCH more realistic!
The interior padding is being done w/ Milliput. This is really this first time that I've worked w/ it and I'm finding that it's really easy.
I began to notice the added weight to the fuse half and instantly started thinking about the internal frame to help carry the weight since the helo will be hovering ....
Here's some work/ thought on the frame as of right now. This is not a tried and true method, but its got to work the first time. Once the fuel tanks are added on to the fuse, there's no turning back. Anyway here's what I've got so far ...
On the inside of the tanks, small notches were cut out for a large dia rod to slide in.
The rod, in place, was filed down w/ a round file at certain spots and a smaller dia piece was glued into place. These cross-pieces correspond to a hole in the fuse half.
Next, there will be an even smaller dia rod that will run under the floor inside the Hook, through the wall and slide into the cross-pieces attached to the larger rod.
Total, there will be about 4-5 rods running through the floor, going out to a large rod on each side. This rod comes out just to the inside of the rear landing gear. It will/ can be seen from the outside, but I'm hoping to make this minimal and I hope it won't be an eye-sore. The weakest part I see to this whole thing is the bend from where it comes out near the landing gear to where it goes into the building and into the base. I'm thinking about using a steel nail, heated and bent to shape for the connection. Since these pics were taken, I've decided to remake the frame using brass tubing so that I can solder the joints.
The following images will give you an idea as to how I plan to build in the frame to the A/C and then into the base.
In the first pic, you'll see the framing as I see it running through the fuse. 2x rods will run the length of the fuse from inside the external tanks. Connecting those to will be a series of 3-4-5 smaller rods running underneath the fuse floor.
In this pic, this is how I plan to have the framing coming out of the A/C near the rear gear, through the building and into the base. I think this idea is going to be pretty stable.