SEARCH FINESCALE.COM

Enter keywords or a search phrase below:

USSR Aircraft Carrier MINSK 1:550

8612 views
5 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    February 2003
  • From: Thailand
Posted by Model Maniac on Wednesday, April 24, 2013 11:55 AM

Hi Bill,

I built a lot in the past. For ship, the biggest one I built was Yamato 1:350 which took 4 days & nights for assembling and 2 days & nights for painting. I painted the deck in grey, same as the whole ship's color because masking was too difficult for me. Lately I still got an idea that I should build an old YF-22 1:72 from Dragon (1991) whose decals are junk now. And though I've bought an airbrush with a small compressor (very faint air output) for a year or two now I've never used it. Think I'll paint it with spray can because I'm too lazy to clean the airbrush after use.

Impressive Songs:

All 10 Playlists that I created on Youtube:

http://www.youtube.com/user/ModelManiacThailand/playlists

Pan Flute Music (300 songs) (Most Popular, over 100K views):

https://www.youtube.com/playlist?list=PLUNb2zPxGTZO7alagEPsEMzgBkWt4-vKV

El Condor Pasa (Top 50) (World's most famous and my most favorite song):

http://www.youtube.com/playlist?list=PLUNb2zPxGTZOLKHbju350mLle4HkMhsb8

  • Member since
    September 2005
  • From: Groton, CT
Posted by warshipguy on Wednesday, April 24, 2013 11:26 AM

Have you considered building them yourself?

Bill

  • Member since
    February 2003
  • From: Thailand
Posted by Model Maniac on Tuesday, April 23, 2013 9:44 AM

I've never set time frame for any builders. It all depends on them how long each batch of job will take.

Impressive Songs:

All 10 Playlists that I created on Youtube:

http://www.youtube.com/user/ModelManiacThailand/playlists

Pan Flute Music (300 songs) (Most Popular, over 100K views):

https://www.youtube.com/playlist?list=PLUNb2zPxGTZO7alagEPsEMzgBkWt4-vKV

El Condor Pasa (Top 50) (World's most famous and my most favorite song):

http://www.youtube.com/playlist?list=PLUNb2zPxGTZOLKHbju350mLle4HkMhsb8

  • Member since
    April 2005
Posted by ddp59 on Monday, April 22, 2013 5:18 PM

i guess that is what you call a "rushin" job.

  • Member since
    March 2004
  • From: Spartanburg, SC
Posted by subfixer on Monday, April 22, 2013 2:40 PM

Not too bad bad for 1.5 days. If you had given him another .5 days he could have gotten the ejector pin marks and seams filled.

I'm from the government and I'm here to help.

  • Member since
    February 2003
  • From: Thailand
USSR Aircraft Carrier MINSK 1:550
Posted by Model Maniac on Monday, April 22, 2013 12:30 PM

Trumpeter's USSR Aircraft Carrier MINSK 1:550 - by "Pramuk Kiatjarungphan" (finished in 1.5 days (one and one half days):

There are 26 more images in my latest page:

http://www.falconbbs.com/model68b.htm



Enjoy! 

 

Impressive Songs:

All 10 Playlists that I created on Youtube:

http://www.youtube.com/user/ModelManiacThailand/playlists

Pan Flute Music (300 songs) (Most Popular, over 100K views):

https://www.youtube.com/playlist?list=PLUNb2zPxGTZO7alagEPsEMzgBkWt4-vKV

El Condor Pasa (Top 50) (World's most famous and my most favorite song):

http://www.youtube.com/playlist?list=PLUNb2zPxGTZOLKHbju350mLle4HkMhsb8

JOIN OUR COMMUNITY!

Our community is FREE to join. To participate you must either login or register for an account.

SEARCH FORUMS
FREE NEWSLETTER
By signing up you may also receive reader surveys and occasional special offers. We do not sell, rent or trade our email lists. View our Privacy Policy.