Well they screwed up the T2.
A lot of " impressive" pipe all over the deck that turns out to be the vent pipes for the holds that runs to the mast. Hand wheels on stems to open the below deck valves represented by plastic upside down "garbage cans".
I ditched the kit deck and started over with fresh styrene.
Hasegawa likes museum ships. Soya and Mikasa.
Bill