I've been working on mine since January. So far,
The hull is painted,
The island is built with lights installed and PE attached.
80 aircraft are built, with PE attached,
A scratchbuilt hanger deck is installed, with lighting.
The hangar deck walls are detailed with scratchbuilt items and handpainted murals on the fire doors and walls.
The flight deck has been masked and hand painted.
The hanger deck is painted with all tie down spots hand painted.
Over head stowage racks are being installed as wells as hose reels.
PE jack stands are finished and cargo pallats are being built.
AND I'VE STILL GOT LOTS TO DO !