Well, work has finally begun. I have 12 new pics in this update, 11 for DBE and 1 for DBR. This build is quite different from the PLE kit. All of the portholes and viewports as well as the hatches and the hanger bay need to be drilled out on both kits. This is what I've mainly been working on. The DBE has much more work that needs to be done on it than the Reliant, So I will be having updates of DBE first. Both ships need some additional scribing done as there are a few hatches missing on the saucer section. It is actually good to have the PL kit nearby for reference. An interesting thing about these kits are the metal saucer supports and plating used to support the warp engines. Both kits should definately have all parts test-fitted before assembling. I've been finding that a lot of them do not match up to well and need to be contoured to fit. The engineering hull has already been assembled by DeBoers and the bottom of the hull needs some serious re-working. Additional puttying and sanding will need to be done as well as some more scribing. The kit comes scribed on the bottom as 1701-A version just FYI. I should have the DBE holes finished by the end of the month and the DBR will be closley behind. See you next update.
~NemVia~