SEARCH FINESCALE.COM

Enter keywords or a search phrase below:

TRUMPETER'S 1-350 HMS HOOD WIP

21746 views
65 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    March 2009
  • From: brisbane australia
Posted by surfsup on Monday, February 7, 2011 5:38 AM

All the Forward Superstructure is now done sans Rigging.....More to come soon.....Cheers Mark

If i was your wife, i'd poison your tea! If Iwas your husband, I would drink it! WINSTON CHURCHILL

  • Member since
    March 2009
  • From: brisbane australia
Posted by surfsup on Monday, February 7, 2011 5:42 AM

Work has now commenced on the Forward Stack and Assicated Deckhouses. All I/M Mesh Screens have been removed and replaced with P/E Mesh Screens. Pilot Holes have been Drilled in various locations to accept the Guide Stays for the Stack. More to come shortly.....Cheers Mark

 

If i was your wife, i'd poison your tea! If Iwas your husband, I would drink it! WINSTON CHURCHILL

  • Member since
    March 2006
Posted by TD4438 on Monday, February 7, 2011 5:57 AM

It's definately getting there.

I shouldn't have looked.

This is too much of a teaser.

  • Member since
    March 2009
  • From: brisbane australia
Posted by surfsup on Tuesday, February 8, 2011 6:33 AM

Thank you for having a look. more to come shortly...Cheers Mark

If i was your wife, i'd poison your tea! If Iwas your husband, I would drink it! WINSTON CHURCHILL

  • Member since
    March 2003
  • From: Rain USA, Vancouver WA
Posted by tigerman on Wednesday, February 9, 2011 11:30 AM

Interesting. So you're painting subsections?

   http://i7.photobucket.com/albums/y269/wing_nut_5o/PANZERJAGERGB.jpg

 Eric 

  • Member since
    March 2009
  • From: brisbane australia
Posted by surfsup on Friday, February 11, 2011 6:13 PM

I usually do depending on how the Kit is broken down. But as a norm, I usually built my kits in Sub-sections and Paint them before they added to the Hull.....Cheers Mark

If i was your wife, i'd poison your tea! If Iwas your husband, I would drink it! WINSTON CHURCHILL

  • Member since
    March 2009
  • From: brisbane australia
Posted by surfsup on Tuesday, February 15, 2011 8:01 AM

I have started working on the after Stack Assembly. All you see is just Dryfitted at this Stage until more is added and I am happy with Results. More to come soon.....Cheers Mark

 

If i was your wife, i'd poison your tea! If Iwas your husband, I would drink it! WINSTON CHURCHILL

  • Member since
    March 2009
  • From: brisbane australia
Posted by surfsup on Friday, February 18, 2011 3:15 AM

The After Stack Area is now complete with Rigging before Painting commences. The Steam Venting Pipes have been attached and the Ends have been drilled out. I have added Plasticard to the interior and some Piping from a cut down Straw to fill the Void to fill this otherwise empty Space. The loose RIgging Lines will be anchored to their repective Ends once the Sub-Assembly is attched to the Model. More to come soon.....Cheers Mark

 

If i was your wife, i'd poison your tea! If Iwas your husband, I would drink it! WINSTON CHURCHILL

  • Member since
    March 2003
  • From: Rain USA, Vancouver WA
Posted by tigerman on Friday, February 18, 2011 11:38 AM

Rigging is another thing that scares me of building ships. A beautiful rigging job just makes it complete IMO.

Keep up the good work.

   http://i7.photobucket.com/albums/y269/wing_nut_5o/PANZERJAGERGB.jpg

 Eric 

  • Member since
    March 2009
  • From: brisbane australia
Posted by surfsup on Monday, February 21, 2011 9:01 AM

Thanks for the comments Tigerman. They are much appreciated. If you plan your Rigging before the Build, it makes it easier. I use a product called E-Z-Line from the States. It is elastic and comes in Black or Grey. The line comes in Spools of 100 Feet and Thick Or Thin. I highly recommend it for 350 or 700 work.....Cheers Mark

If i was your wife, i'd poison your tea! If Iwas your husband, I would drink it! WINSTON CHURCHILL

  • Member since
    March 2009
  • From: brisbane australia
Posted by surfsup on Monday, February 21, 2011 6:48 PM

Except for some Touchup Spots and some Clear Flat, The Stacks and Rigging have now been added to HMS Hood. More to come shortly.....Cheers Mark

If i was your wife, i'd poison your tea! If Iwas your husband, I would drink it! WINSTON CHURCHILL

  • Member since
    March 2009
  • From: brisbane australia
Posted by surfsup on Wednesday, February 23, 2011 8:41 PM

Have started adding Shelters, Liferafts and Ammo Bins to the Shelter Deck. More to come soon.....Cheers Mark

If i was your wife, i'd poison your tea! If Iwas your husband, I would drink it! WINSTON CHURCHILL

  • Member since
    March 2009
  • From: brisbane australia
Posted by surfsup on Friday, February 25, 2011 5:19 AM

OK. The 15Inch Blast Bags have been Base Coated. All Ammo Bins and On Borad Life Boats are now in position. More to come soon.....Cheers Mark

 

If i was your wife, i'd poison your tea! If Iwas your husband, I would drink it! WINSTON CHURCHILL

  • Member since
    March 2006
Posted by TD4438 on Friday, February 25, 2011 4:13 PM

I am so enjoying this WIP.Gorgeous boat!

  • Member since
    March 2009
  • From: brisbane australia
Posted by surfsup on Friday, March 11, 2011 10:23 PM

Thanks very much for your comments TD and I am happy you are enjoying the Build as much as I am.  Work has now commenced on the after Conning Position. The small Boat Cranes and Shelter Deck Access Ladders have now been added with their Guardrails. More to come shortly.....Cheers Mark

If i was your wife, i'd poison your tea! If Iwas your husband, I would drink it! WINSTON CHURCHILL

  • Member since
    March 2009
  • From: brisbane australia
Posted by surfsup on Wednesday, March 23, 2011 7:16 PM

Have started work on her Secondary Armement. The 4Inch HA and Pompom Mounts have had their P/E added and Base Coated. More to come soon.....Cheers Mark

 

If i was your wife, i'd poison your tea! If Iwas your husband, I would drink it! WINSTON CHURCHILL

  • Member since
    March 2009
  • From: brisbane australia
Posted by surfsup on Friday, March 25, 2011 7:08 AM

Secondary Armement has now been added along with Final Liferafts and Searchlights. The Pompom Armement has been painted Gold and both sets of Armement has been given a Tamiya Smoke Wash to pop out some of their Details. More to come soon.....Cheers Mark

 

If i was your wife, i'd poison your tea! If Iwas your husband, I would drink it! WINSTON CHURCHILL

  • Member since
    July 2004
  • From: Sonora Desert
Posted by stikpusher on Tuesday, April 19, 2011 9:50 PM

A very inspiring WIP thread to view!Yes Lots of great ideas here to emulate. Hmm I am looking forward to seeing the completed build!Smile

 

F is for FIRE, That burns down the whole town!

U is for URANIUM... BOMBS!

N is for NO SURVIVORS...

       - Plankton

LSM

 

  • Member since
    March 2010
  • From: New Zealand
Posted by Scorpiomikey on Tuesday, April 19, 2011 10:04 PM

Ive always liked the story of the Hood Bismarck encounter. Maybe like is the wrong word. its always interested me.

Thats a mighty fine lookin ship you got there.

"I am a leaf on the wind, watch how i soar"

Recite the litanies, fire up the Gellar field, a poo storm is coming Hmm 

My signature

Check out my blog here.

  • Member since
    March 2009
  • From: brisbane australia
Posted by surfsup on Wednesday, April 27, 2011 1:26 AM

Thanks Mike and Stick for stopping buy and your comments are appreciated. Have not done much for a while through Life, Work and a bit of Burnout but am back into her Build. I have started work on her Stack Tops buy drilling out the Moulded Details on her Caps and replacing them with P/E. The Paravanes combine 1 Plastic and 5 P/E Parts and drove me Nuts. Have also built up 10 P/E Cable Reels and will rig and place them shortly.  The Pen in the Pic gives you an idea of the size of the Paravanes. More to come soon.....Cheers Mark

 

If i was your wife, i'd poison your tea! If Iwas your husband, I would drink it! WINSTON CHURCHILL

  • Member since
    March 2009
  • From: brisbane australia
Posted by surfsup on Wednesday, April 27, 2011 9:37 PM

All Mushroom Vents and most Deck Equipment has now been added. Will be starting on the Mainmast next. After that, all I have to do is the Railings, Rigging and Weathering to finish her off.....Cheers Mark

If i was your wife, i'd poison your tea! If Iwas your husband, I would drink it! WINSTON CHURCHILL

  • Member since
    March 2009
  • From: brisbane australia
Posted by surfsup on Friday, May 13, 2011 5:04 AM

Have now commenced work on her Mainmast. Things were going along nicely until I realised that I had put the Starfish Platform on backwards. That has now been fixed and main Assembly is now complete. With this Mast done, I now only have the Small details, Rigging, Railings and weathering to go. More to come shortly....Cheers Mark.

If i was your wife, i'd poison your tea! If Iwas your husband, I would drink it! WINSTON CHURCHILL

  • Member since
    March 2003
  • From: Rain USA, Vancouver WA
Posted by tigerman on Friday, May 13, 2011 8:10 PM

Great build. I'm enjoying the WIP.

   http://i7.photobucket.com/albums/y269/wing_nut_5o/PANZERJAGERGB.jpg

 Eric 

  • Member since
    October 2008
  • From: italy
Posted by bsyamato on Saturday, May 14, 2011 7:12 PM

This wip give me the wish to continue my little copy in 1/720

Really appreciate the work on Surfsup

  • Member since
    March 2009
  • From: brisbane australia
Posted by surfsup on Monday, May 16, 2011 7:06 AM

Thank you for your comments Gentlemen. They are greatly appreciated. Have almost completed the Mainmast. Will have some Pics up soon and not too much to go to finish her.....Cheers Mark

If i was your wife, i'd poison your tea! If Iwas your husband, I would drink it! WINSTON CHURCHILL

  • Member since
    September 2007
  • From: Truro Nova Scotia, Canada
Posted by SuppressionFire on Monday, May 16, 2011 7:23 AM

Long haul indeed!

Way to stick with the build Surfsup!

Your excellent WIP's and text will help fellow modelers with their ship yard construction.

Once complete may I request a few outdoor photographs? It seems the lighting around your work area has changed the tint & hue of the color.

http://i6.photobucket.com/albums/y211/razordws/GB%20Badges/WMIIIGBsmall.jpg

 

 

  • Member since
    March 2011
Posted by gonavycv64 on Monday, May 16, 2011 2:02 PM

Wow, the HMS Hood looks awesome.  You have a lot more patience than I do.

  • Member since
    February 2011
  • From: San Antonio
Posted by MAJ Mike on Monday, May 16, 2011 3:20 PM

Wow!  Just wow!! Yes

 

 

 "I'd "I'd rather be historically accurate than politically correct."

"Sic gorgiamus allos subjectatos nunc!"

  • Member since
    March 2009
  • From: brisbane australia
Posted by surfsup on Tuesday, May 17, 2011 4:53 AM

Thank you for your comments Gentlemen. They mean a lot to me. And as for the request to take Pics outside when she is done, I would be more than happy to accomodate with your request.....Cheers Mark

If i was your wife, i'd poison your tea! If Iwas your husband, I would drink it! WINSTON CHURCHILL

  • Member since
    March 2009
  • From: brisbane australia
Posted by surfsup on Tuesday, May 24, 2011 5:51 AM

MainMast is now stepped and rigging has now commenced. Not much more to do now. More to come soon.....Cheers Mark

 

If i was your wife, i'd poison your tea! If Iwas your husband, I would drink it! WINSTON CHURCHILL

JOIN OUR COMMUNITY!

Our community is FREE to join. To participate you must either login or register for an account.

SEARCH FORUMS
FREE NEWSLETTER
By signing up you may also receive reader surveys and occasional special offers. We do not sell, rent or trade our email lists. View our Privacy Policy.