Almost 30 days have gone by and nothing to report on this build.
Here is why:
My Mother in Law got diagnosed with very invasive cancer at the begining of July and I had to make several trips to Dallas to be with her. She is now doing much better with Chemo.
Then, at the same time, I started getting an adomoninal sickness around the 4th of July that got worse every week. Many tests, including CT and MRI, and inspections of places I do not want to mention, found I had clogged bile ducts from residue left from my old Gall Bladder that was removed some yeears back. So, I got to get my upper digestive system scoped and all this gunk, including a 1cm stone, sucked out. A week after the procedure and I feel 100% better than I had over the past 10 years. All my labs this week show I am healthy again.
And to top it off, the old model shop in the basement got soaked again, this time from the hot water tank blowing the water drain faucet out and 50 gallons of hot water spraying all over the basement.
After a new hot water tank installation, which I did the day after my endoscopic operation, and a complete cleaning of the basement, I should be ready to start back on the Lexington, right?
Wrong, this past week, the weather has brought storm after storm which has caused a limb to knock out my power for a day, which knocked out my pumps, which until I got the generator on line caused 2" of water to form in the basement.
So, back to cleaning the model room and getting it to dry out, then back to work on the Lexington.
My wife did promise me I could have the bedroom upstairs to model in when the kid is done with college.
I promise, this model is going to get done!
Scott