hi fellas , i'm wondering how anyone can do a build in two days?? i can do it
: looking at pictures of the real thing , opening the box , plan exspection , all the spreus degreasing , cutting and sanding , put it together , filling , detailing , base coat , let it dry (min.24h.) , gloss cote(min.24h), decalling , dull cote(min.24h), washing,drying(min.24h),highlighting , metallizing , dusting , applying muck
let us not speak if you want chipped paint (salt tech.) and all that i forgotten (figs.and so)
, you must be superbuilders , well just enjoy yourself thats the mainpoint