Hi All,
I hope you are all well. We are getting into the gritty stuff now!. The first thing i wanted to do was to paint the superstructure walls which come in two pieces and join up with the whale back wall and the fan tail. I spotted a little problem with them though. The over hang of promenade deck A is far too excessive below the bridge for about one third of the way back. I had to split the join and move inwards and re-glue which corrected the problem. It was a relatively painless task as can be seen below.
Before:
i911.photobucket.com/.../WP_000337.jpg
After:
i911.photobucket.com/.../WP_000340.jpg
Next up was the super structure frontage\bridge area. As can be seen below the windows of the passenger area are far too large and are not in the right position. I glues a sheet of acetate behind the windows for support, filled and painted the pieces.
Before:
i911.photobucket.com/.../WP_000339.jpg
Middle:
i911.photobucket.com/.../WP_000341.jpg
After:
i911.photobucket.com/.../WP_000342.jpg
Next up was the beautiful radar mast. Glencoe has put indentations in the side of it for some strange reason, these required filling and painting.
Before:
i911.photobucket.com/.../WP_000338.jpg
After:
i911.photobucket.com/.../WP_000343.jpg
After this i finished the painting on the port hull. The exposure is a little bright on this one.
i911.photobucket.com/.../WP_000346.jpg
I started work on the superstructure on the boat deck by base coating it and have identified a few issues here. Before base coating i cut the symbolic rail out above the wheel house which came whol on the kit.
i911.photobucket.com/.../WP_000344.jpg
I also identified new base decks for the funnels need to be made as the ones supplied are too low. The cafe provencale needs to be completely scratch build and the skylight behind funnel number two has to be scratch built. I also need to examine in detail behind funnel number 1 as i think it might not be correct. The windows are represented very well though along the passenger areas of the boat deck.
The life preservers on the top of the house are molded to the wrong shape in between the funnels so i sanded do but not too low as i want to remember their positions for scratch built parts.
the superstructure repaired earlier will also require scratch built parts for the promenade windows as they are not included in this kit but will show you how this is done later which is tedious but simple to complete.
Here are a few more pics, alot of work done in four hours.
i911.photobucket.com/.../WP_000345.jpg
i911.photobucket.com/.../WP_000347.jpg
i911.photobucket.com/.../WP_000348.jpg