SEARCH FINESCALE.COM

Enter keywords or a search phrase below:

Back-dating PT-596

490 views
2 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    February 2007
  • From: Sterling, VA
Back-dating PT-596
Posted by oldmodeler on Sunday, February 11, 2007 6:57 PM

Here are some photos of my efforts so far. I normally build plane and armor. These  photos show the major sub-assemblies set in place w/o glue. The mast hinge pins are not the final pieces. I have more details to add to the mast but I think it looks pretty close.

Comments?

Ed

More photos:

 http://www.villagephotos.com/pubbrowse.asp?folder_id=1822847

 

  • Member since
    March 2006
  • From: Bangor, Maine
Posted by alross2 on Sunday, February 11, 2007 7:14 PM

Ed, it looks like you're doing a fine job.  Italeri has misinterpreted the flag halyards on the radar mast as some sort of rod support.  If you get rid of the two vertical pieces and replace them with thread, you'll have the correct configuration.  That box on the port side of the forward bulkhead of the day cabin is the "flag bag", in which they kept the signal flags.

Al Ross 

 

  • Member since
    February 2007
  • From: Sterling, VA
Posted by oldmodeler on Sunday, February 11, 2007 7:49 PM

Thanks Al. I'll fix the halyards. Thanks for correction and thanks again to the SO radar mast drawing. Now, if I could just find a couple of 1/35 , affordable, 20 mm and lightweight mounts to put in front of the front torpedos...... 

Thanks again,

Ed

JOIN OUR COMMUNITY!

Our community is FREE to join. To participate you must either login or register for an account.

SEARCH FORUMS
FREE NEWSLETTER
By signing up you may also receive reader surveys and occasional special offers. We do not sell, rent or trade our email lists. View our Privacy Policy.