SC, looking to have everything framed up, sheeted, and insulated before the snow flies this year (which can be, and usually is, sometime in late October) and then I can commence on the interior details of the room itself (which will come after the garage area is done). Not looking forward to the drywalling, that's for sure!
Building a 109 sounds like a lot more fun, Frank! (Good to see you too, buddy!)
....and thanks for the slack, Mikester!
Here's a few progress pics. The concrete footings go down 4 feet (gets mighty cold up here in winter). All the framing is 2x6. The work area, which will be fully enclosed, vapor-barriered, and insulated, will be a 9x10 area towards the back of the garage on the right (second pic).