SEARCH FINESCALE.COM

Enter keywords or a search phrase below:

USS Essex 1:350 Trumpeter Build

22343 views
135 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    May 2008
  • From: Wyoming Michigan
Posted by ejhammer on Sunday, March 18, 2018 5:12 PM

I had a site for lighting that looked like sheet styrene. Can't find it now but will keep looking.

Completed - 1/525 Round Two Lindberg repop of T2A tanker done as USS MATTAPONI, USS ESSEX 1/700 Hasegawa Dec 1942, USS Yorktown 1/700 Trumpeter 1943. In The Yards - USS ESSEX 1/700 Hasegawa 1945, USS ESSEX 1/700 Dragon 1944, USS ESSEX 1/700 Trumpeter 1945, USS ESSEX 1/540 Revell (vintage) 1962, USS ESSEX 1/350 Trumpeter 1942, USS ESSEX LHD-2 as commissioned, converted from USS Wasp kit Gallery Models. Plus 35 other plastic and wood ship kits.

  • Member since
    March 2012
  • From: Louisville, KY
Posted by Builder 2010 on Sunday, March 18, 2018 3:31 PM

It's Sunday, but I'm reporting on Friday's session...

Filled the flight deck gaps with Tamiya putty. I didn't want to damage any of the FD engraving so I masked (with Tamiya tape) very close to the gap itself, filled the groove without worrying about the overlap, and when the tape was pulled, it was just in the groove and nowhere else. It just took the lightest of sanding to smooth it out.

There were expansion joints on carrier FDs so these will be those.

I then wanted to attempt to fit the FD to the hull. I spent a lot of time doing this since I wanted to figure out where the clamps had to go, what was impinging on what and planning out how (and when) to do it. I had to remove more raised alignment lines that were going to be a problem. When I got it so it so it would almost drop in place I stopped since I'm gluing it on yet.

It was time to get the lighting in place. Let me start by saying, the end result of Friday's session is not satisfactory. My lighting scheme is too over-designed and bulky. I'm using CL2N3-G LED drivers to manage the 5 VDC input. These little packages take anything from 5 to 90 VDC and feed it to the LED at 20 milliamps. You can string as many LEDs in series as the input voltage will allow. In this case, I can probably drive 2 in series. They won't reach full brightness since each LED drops 3 VDC. To run them in parallel you have to gang these devices, since they only put out 20 milliamps. In a parallel circuit with two legs, each leg pulls 20ma, so the total current draw is 40ma and you'd need a driver on each leg.

The input side is on the left side of the flat. The center lead is no used, but supports the package if it's mounted in a printed circuit board.

I'm using small 2mm LEDs which I wanted to face towards the ceiling and then reflect downward to provide a more diffused lighting. So I drilled 2mm holes in some styrene, and CA'd and then epoxied the LEDs into the position with their lenses through the hole. I put down some aluminum foil with some pressure sensitive adhesive to make the ceiling more reflective. I let the epoxy drill all weekend. It's a composite picture which accounts for the slight distortion.

So here's the problem... I thought I needed to raise the LEDs off the ceiling to give enough clearance for the light to escape, which is technically correct, but when I put the deck in place on the hull to see how it all fits, it was terrible. The light assembly is too tall and almost touches the flight deck floor. When you peer inside through the side elevator opening all you see is lighting assemblies. Yuck! No room for airplanes and completely destroying the effect I was looking for.

So what to do? Ideally, the lighting should come from fiber optics (which I don't have). If I can't do that, I will probably mount the LEDs directly on the ceiling and have them facing downward not worrying about indirect, diffuse lighting. I can mount the circuitry very tightly to the ceiling so it won't be seen unless you're lookin up into the hangar bay. Otherwise, I'm going to scrap the lighting altogehter. I don't want to invest in fiber optics, although I may research it to see what's what. Tomorrow, I will rip it all out and go for plan B. With fiber optics, the light box can be below the hangar deck and I could bring the bundle up through the pipe I've installed to bring in the power wiring. I think I'm talking myself into this...

Addedum to post: found that I can get 100ft of 1mm fiber optic filament on eBay for less than $10.00 so I ordered some and will give it a try. I found a place called the Fiber Optics Store, which also advertised on eBay, but their website cart was not functioning properly, so I went onto eBay and bought from another supplier. I read a blurb on how to attach LEDs to the fibers using shrink tubing so that's how I'll do it. More about this when it comes in a couple of days.

  • Member since
    March 2012
  • From: Louisville, KY
Posted by Builder 2010 on Thursday, March 15, 2018 6:44 PM

You did them great! And they are a royal PITA! Like I said, it was worth the $40.

Finished building the hybrid Boat Cranes. GMM calls for removing the base and the upper works. I machined and soldered the bases, but did cut away and CA the upper works to the boom. Stuff actually went pretty well and was not stressful.

The hooks was a one piece PE that is CA'd into a small slot etched into the boom bottom. I didn't machine the base pin very carefully... it didn't matter... I just adjusted the hole size on the hull.

Next up was the flight deck. I removed those plastic outriggers next to the lower twin turrents and prepared the edge to accept the folded PE replacement. I also removed some of the alignment ribs under the deck that were supposed to mate with the hangar deck houses. They didn't fit well and I read a review that said the same thing. It was taking much to much pushing and shoving to get it to sit down and it would mean probably breaking something to get it together.

I used a sanding drum on the flexi-shaft and then cleaned up with a plastics chisel and files.

It fits much better with these guides removed. I'm sure if it was Tamiya or Hasegawa kit instead of an old Trumpeter, I wouldn't have to do this.

Lastly, I started adding the under-FD details, including some lift rafts and the box sections that support the catwalks. There are ejection pin marks on all the catwalks, but I think they're not going to be see when the PE goes in. I'm going to add the FD PE AFTER the deck is glued down. There's too much handling to get the deck in place and the PE would get whacked. I do have to add the forward 40mm mount and director before the deck goes down since it's really occluded by the deck overhang. That's the reason why later Essex series ships were built as "long-hull" ships with the flight deck moved back a bit so the forward 40mms had a decent arc of fire. As it is with the early Essex, they could only shoot pretty much straight ahead. You would have thought that they would have seen this in the design phase.

On the hull side, there is a door and a slanted raised rib that corresponds to an inclined ladder that I'm going to install, but I needed to have the FD in a near final form to see if it clears the upper ladder hand rails. I didn't want to glue this is only to have it crushed when the flight deck goes down. I also need to add the ribbing supporting the side elevators runners and detail the whaleboat.

This was a pretty short session today, but it was productive. Tomorrow I will start adding the lighting, and then paint the interior of the flight deck white before closing the lid.

  • Member since
    December 2010
  • From: Salem, Oregon
Posted by 1943Mike on Wednesday, March 14, 2018 6:52 PM

Builder,

I think it's great that you found those 20mm guns on eBay. I wish I'd found something like that when I was working on my USS San Francisco. Such a PITA to have to put those guns together with the GMM PE!

 

Mike

"Le temps est un grand maître, mais malheureusement, il tue tous ses élèves."

Hector Berlioz

  • Member since
    March 2012
  • From: Louisville, KY
Posted by Builder 2010 on Wednesday, March 14, 2018 5:51 PM

An odds and ends day...

Started by preparing and gluing up the flight deck. There were mold imperfections at the junctions, so even after filing it as flat as I could it still showed some significant gaps. Since I was not putting the decks into position on the hull and was going to be handling the entire glued up deck, I had to reinforce the joints as much as I could using Plastruct heavy H-beams... very stiff and glues well to styrene. When I first put the beams on, I had one in a place where the hangar deck structures impinged with it. I tested it again after I moved it and added another, and that too got in the way. Luckily, the glue hadn't set and I was able to move it to a better spot.

You can now pick up the deck anywhere and it holds together.

Here are the gaps which I will judiciously fill so they're be less noticeable. I will mask the deck area when I sand the filler if I need to so I won't sand off all the deck planking details.

Next up was putting the PE railings onto the 5" single mounts. Funny... it appears that trumpeter made these guns backwards. The guns load from the left side and the rammer wall should be on the right side of the breach area. In this molding they're on the left side, while the instructions show a drawing with the loaders on the correct side. As it is, the left rail which has the fuze setting machine is on the correct side.

As usual, no mortals will notice this.

Then I modified the 5" twin mount bases to accept a nicely perforated base replacing the thick plastic version. To do this you had to cut the base away from the top and substitute the PE for the removed plastic. I did this using the micro razor saw and then a #11 blade on the inside to inscribe the cut line. 

The pin on the mounts was slightly larger than the hole in the PE so I used a #40 drill to open it slightly and the gun fit in perfectly.

There is also one of these screens that goes next to each deck-mounted 5" twin, but first you have to remove the plastic version sticking out from the deck. I didn't do that today since the flight deck was not securely cured. I'll do that next session.

Lastly, I built the PE boat crane replacements using my fold-and-solder technique. It's moderately complicated fold, plus there's a separate piece that gets curved and installed in the crane's crotch. I really can't imagine how unstable this would be if you had to rely on CA to hold it all together, almost all the joints were handled with the RSU.

The PE part to fill that gap was the exact size and it kept falling inside when attempting to solder it. I cut some PE brass slightly oversized and made a lap joint which is much more secure, soldered easily and will not detract from the effect. You're required to cut parts from the ship's plastic cranes to mate the PE version to the ship. I'm going to think about this and take a look as some detail pics of the real cranes and maybe do it in brass.

  • Member since
    March 2012
  • From: Louisville, KY
Posted by Builder 2010 on Monday, March 12, 2018 5:46 PM

Back in the shop! Whoopee!

And the Blue Ridge Models 3D printed resin 20mm gun mounts arrived today. I had already started back building the modified kit guns, went upstairs for lunch and my wife said I had a small box arrive.

Here's another closeup of the array. They're held to the base with 6 supports. 

They're very, very delicate for two reasons. First, they're very small, and second, they're resin which is brittle. If you clip the supports with too much force, stuff can break. If you grab then a bit too hard, stuff can also break. I had some trouble with the shoulder rests and lost one side on three of them. I also broke the splinter shield on a few which I replaced with PE.

This is a telling shot. It shows the PE modified kit guns with their "massive" gun barrels and the complete 3D printed one. It was worth the $40 already in that I installed all of the guns in the island in the time it would have taken to cobble together two more mounts. And there's really no comparison about the overall effect.

Being resin, you must use CA to install. I finished up the island in a couple of hours.

In this next picture, you can see the ones where I had to replace the shields. I didn't want to scrap them becuase I'm going to need every one. The GMM PE shields are a bit shorter than the 3D printed ones. Will it matter... I don't know. Right now with the brass shining away, it's quite obvious, but when all paint navy blue, you may not notice the slight size difference unless someone told you.

You can also see those with missing shoulder rests. As I get more experience in preparing these little pieces and should break less of them.

On one, I broke off the tiny barrel. I drilled the stub with the tiny, 0.0105" drill and inserted a piece of guitar wire which was just about the right diameter. It was a bit long, so instead of pulling it out, cutting it and putting it back in, I (stupidly) tried to cut it with the Xuron hard-wire cutters and the shock broke off the gun top from the base and sent it into the Rift. I was left holding the base in my locking tweezers. Next time, I do it right. Incidentally, don't ever attempt to cut guitar string with normal Xuron cutters. You will be left with two half-moon grooves in the edges and probably an un-cut piece of wire. (experience talking here. "Good judgement is the result of experience which is often the result of bad judgement.")

The island is finally ready for a final cleanup and paint.

I'm going to start building the flight deck. Instead of putting the three pieces onto the hull separately, I'm going to fully assemble it with reinforcement at the two joints. I started prepping the joinery before the 20mms arrived. I intend on installing LED lighting on it and that has to be done on the total deck. There's a ton of added detail that goes on the flight deck sides including catwalks, added railings and small steps.

  • Member since
    March 2012
  • From: Louisville, KY
Posted by Builder 2010 on Sunday, March 11, 2018 1:04 PM

I taught soldering to about 2,000 people with some significantly positive results, so I could put together a pretty good tutorial on the subject. There's lots of soldering clinics on YouTube... some good, some dead wrong. You have to separate the wheat from the schaff.

I did an article in Classic Toy Trains in November 2001. It was the cover story. It was mainly concerned with doing effective soldering of power leads to model train tracks. For soldering PE, the techniques and tools are somewhat different. I'm still developing techniques for this, since PE, by its nature, is very delicate and tempramental. (this site doesn't have a spell check, and I think I spelled that wrongly).

You may wonder why a whole week went by without a post on the Essex. I had a stomach (intestinal) flu that was quite strange in that it was all cramps and nothing else. No nausea, diarrhea, vomitting... nothing. But the pain was significant and annoying and I didn't feel like sitting in the basement building those %@(*% 20mm guns. 

So instead, I decided to trade my time and frustration for $$$ and bought some new Blue Ridge Models 3D printed 20mm single gun mounts which include nicely formed barrels, shields, shoulder rests and ammo cans. They come 24 to a rack so I bought two. I'll just have to add gun sights (if I want to) and I'll have nice, scalish 20mms. I would have spent the entire week building the others anyway, so I probably didn't lose much productivity.

These things should work pretty well. Painted, they will look terrific. I can see you have to very, very careful cutting them loose from all the 3D supports. They're not cheap at $20 per unit, but I spent that much ($40) for the 3D printed architectural details for the Bronx Building, so I guess that's not too bad. 

As a result, I was looking at what it would take to have my own 3D printer. There is such a variety and now that the Chinese are flooding the market with functional filament deposit machines, there's a lot to choose from and a huge price range from less than $200 to multi-thousand and still be 100 micron resolution. I feel that for 1:48 work, you probably need 50 micron (or less). For 25 micron, you at the limit for filament machines and probably are looking at stereo lithographic ones. They are dear ($3000+) and are out of my price range by an order of magnitude. I'm not looking to make trinkets and curiosities, but want to make real functional parts for buildings and models. For instance, it would be great to print the two turret domes for the Nighthawks Cafe and not have to attempt to turn them on my tiny lathe.

There is a maker's club in Louisville that has 3d printers and laser cutters to use, but it is a $50 a month membership. I'm not happy with that and would have to think seriously about spending a third of my hobby budget just on the membership.

On the other hand, I'm not looking to get into another hobby. I don't want to buy a tool that has a steep learning curve and intensity requiring all that attention and experimentation. And, while I have all the skills to build a kit printer, again, I'm not sure I want to take the time.

I'll take some feedback on this...

Meanwhile, my alimentary canal is working normally. I had a blood test to rule out any pancreatic or gall bladder nonsense and the numbers were all perfectly nominal. So it was just a bug, and a strange one at that. Tomorrow, I'm back in the shop.

  • Member since
    December 2003
  • From: 37deg 40.13' N 95deg 29.10'W
Posted by scottrc on Tuesday, March 6, 2018 8:20 AM

A lot of nice metalwork there.

  • Member since
    July 2010
  • From: Tempe AZ
Posted by docidle on Monday, March 5, 2018 11:08 PM

Builder,

Thanks for posting all these details shots and telling what you are doing. They really are a help! It is times like this that I wish I had taken shop in high school! I really need to bone up on my so “called” soldering skills.

I hope you’re feeling better after your fall.

Steve

       

 

 

  • Member since
    March 2012
  • From: Louisville, KY
Posted by Builder 2010 on Friday, March 2, 2018 6:33 PM

Spent a lot of time today making some very small things...

I made another searchlight to replace the one that's missing. I turned a cylinder the diameter of the prototype, 36" = 0.100" approx. at 1:350. I then turned a pedestal. This came out nicely, but as you'll see it's a bit tall. I could have made it shorter, but didn't feel like making another. The only way you know is if you look at the ship head-on and see port and starboard lights at the same time.

Before parting the cylinder off the stock, I took it out of the lathe, put it in a v-block, filed a flat on the circumference so the center punch and drill would skitter off the circle, and then drilled with a 0.032" carbide drill in a pin vise. I had to drill through the center hole and had to be careful to keep it aligned and not break it. I use Tap Magic for brass when drilling and turnind which helps prevent grabbing which is notorious when machining brass with positively-raked cutting tools. Normally, brass tools are ground with 0 or negative rake angles to scrap the surface rather than cut into it. The rake angle is the back slope of the cutting edge. Positive rake has an acute angle falling back from the cutting lip. Even with drills, if they're large enough to do this, you can grind a small flat behind the cutting edge to reduce the rake angle.

I made the bail with a piece of PE fret brass and turned the base with a 0.032" base pin and pin for the bail. I needed to set the hole spacing for the trunions. The cylinder was .100", and the trunion pins would lie on the diameter, so I multiplied .100 X pi, and then cut that in half and added 0.020" for some clearance. I could have added more, but the bail did fit over the pins. After soldering it all together, I trimmed the bail and filed off the trunions. I filled the center hole with solder to make a face. I was going to leave the hole, but the trunion passed through the middle.

Here's the installed search light.

Next I built the GMM PE loudspeakers. They're a three-part affair with a folded box, a perforated screen and a small folded bracket. I decided to solder these together after messing around, unsucessfully, with CA. The first one I made (which eventually flew out of a tweezers into the Rift) I soldered the screen and then attempted to solder the bracket. This was a mess. The next one, I soldered the bracket first and then soldered on  the screen. This worked. But I lost a couple of the brackets, so the next two I made a bracket with a strap of PE brass. This actually worked even better. You can't see that microscopic bracket anyway.

So I only had three of them at that moment. I CA'd the first one to the front wall of the flag bridge as shown in one of my diagrams. The other goes on the rail in the island's middle. This didn't want to settle down with CA, so I went with J-B. Since it sets very slowly, I laid the island over almost horizontal by swiveling the Panavise base into that position. It will be cured on Monday when work begins again. You can just see it below the radar antenna racks facing upward. The 3rd loudspeaker, which was supposed to go on the aft end of the island, flew out of my tweezers on the way to put some CA on its bracket and went into the Rift.

I started building the 20mm gun sets. GMM includes four PE pieces for each gun: shield, shoulder rests, gun sight and elevating wheel. Of these, the easiest to install was the shield, but I did have to rough up the brass at the glue site to give the CA something to stick to. I also put on a set of shoulder rests. I tried, successfully at first, to install the tiny gun sight, but it fell off and then got lost. I also tried to install the hand wheel, and it too fell off. So it took quite a while to get one done. I got the second one underway before dinner time. I've got to build 13 of them just for the island. I have a full set of 20mm PE guns left over on my MO Eduard set. These are a folded deal that already includes the shoulder rests, but lacks a base. The base pin is about 0.020" and could work (maybe) with the Trumpeter bases, or I could just turn a set of custom bases and solder the whole deal together including the shields. I have to think about this over the weekend.

That's an #11 blade in the picture for scale comparison, so you can get a good idea about just how small that gun site is AND you have to rotate the circle site so it's perpendicular to the barrel. It just has that tiny base to hold it to the gun barrel. It's not a pretty thing and I'm not so sure it will be successful, at least for me. I am sure there are builders some where out there in this wide world that have the steadiness and techniques to build these micro-PE assemblies.

Here's the completed one. The Trumpeter barrel is WAY out of scale. The Eduard ones are much closer to scale, but they lack that base. Nothing's perfect. I've looked at some of those Korean and Chinese PE company products which have turned barrels and so much detail, but I can't figure out how you'd build the darn things. At 1:200, you'd have a chance, but at 1:350, it seems almost impossible, based on my experience.

 

  • Member since
    March 2012
  • From: Louisville, KY
Posted by Builder 2010 on Thursday, March 1, 2018 6:48 PM

After sleeping on the problem of making that little ladder platform, I did attempt #4. This time, I did two things differently: I found a piece of railing in the leftover Mo set that was a short railing with another even shorter segment. And then I shaped a brass platform to match this configuration. I also added to folded angles to act as brackets to increase the gluing area many fold and solve that problem of not relying on the railing itself to aid in gluing. This closeup makes it look terrible. It's really not bad...a little off kilter, but it will work. The inclined ladder has to go on after it's glue to the deck... I think. I may want to glue it on now so I can paint it before installing it.

I then added the 40mm gun mount and the MK 51 director so this piece is ready for paint (except for the aforementioned inclined ladder).

The latest guy wire gluing went well too with the guitar strings firmly attached to the mast and deck. I then decided to add the wind deflectors. The GMM wind diflectors looked to me as a complete exercise in futility. It consists of some etched strips with little relief cuts and then a ton of little pieces to serve as the supports. I cannot, for the life of me, figure how to a) attach all those parts without going nuts, and b) then bending it around the deck rails and glue it in place without all of those tiny pieces breaking loose. I thought about soldering them in, but I'm not that good.

This image is bigger than it actually is. I can even imagine cutting all those pieces off the fret without losing half of them to the Rift. Sometimes with PE, just because you can draw it, expose it and then etch it, doesn't mean a mortal (like me) can build it.

So I did a plan B. You can really see the slats holding it on, so I took some wine bottle foil and a piece of 0.020" Evergreen round styrene rod to use as a spacer. I measured the PE strip at 0.037" and used the same digital caliper to scribe a line of that distance on the foil. I held a straight edge up to that line and CA'd the styrene to the foil, BEFORE CUTTING THE FOIL STRIP since I could not imagine getting the two aligned with that wiggly, strip moving all around. When the CA set I then cut the foil with a sharp #11 blade and the same straight edge.

By using the styrene as the spacer I was able to use Tamiya cement to glue it to the ship. 

A little forming and shaping was needed once it was glued. Again, once it's painted it should do what was intended.

Lastly, I started laying in all the added stuff on this complicated sub-assembly: Mk 51 directors, signal and search lights, MK 38 directors, 40mm guns, etc. Starboard Side -

Port side -

I did straighten out the steam line to the whistle. There's also a smaller diameter pipe going to that same area that I may add. Still to do are all the 20mm gun sets for the island (and the rest of the ship). One of the side-of-funnel searchlights is missing. There were supposed to be two of them, but the sprue attachment was very weak on these parts and both fell off (one of each of two identical sprues). I captured one for safe keeping, but have lost one. I'm going to scratch build one. If it works well, I may scratch build both. It goes in that sponson with the half railing next to the funnel.

I almost had a heart attack... notice how close my outrigger for the mizzen mast aft guy wire is to the Mk 38 director aft of the funnel. It just fit. In real life this outrigger would have been much, much smaller. I could have made it smaller since I was just winging it. I didn't even think about the director going so close.

I'm going to paint and detail all of this before gluing it to the deck. I may also add all the rigging that is contained within the island since it's much easier to do this while holding it my PanaVIse than to do it leaning over the ship.

  • Member since
    March 2012
  • From: Louisville, KY
Posted by Builder 2010 on Wednesday, February 28, 2018 6:46 PM

The Island is coming together... in fits and starts, but it is getting together. I first added a very small rail at the stair landing at the top of the left most ladder. I find that small rails like this, instead of being easy are a royal pain in the butt. They're very springy and if you grab them the wrong way they fly. They also want to glue too quickly before they're sitting just so... and then when you just want to tweak them a little teeny bit, they fall off and you have to start over again. I did that five times before I got one to be where I wanted it without being a distorted mess.

Boy, these models are not meant to look at this closely...

The J-B Weld cured nicely for the mizzen mast guy wires so I was ready to start adding more stuff. Next up was the whistle platform. In this case, I soldered a piece of flattened 0.021" brass wire for the mounting pin. I also did the same on another small antenna platform. I am so glad that I spent the effort to add these brass pins to the PE platforms. The angle brackets are useless, and are almost always bending and breaking off. You CAN NOT DEPEND ON THEM TO ACTUALLY SUPPORT THE PLATFORM! The whistle was scavenged from the old MO and I drilled the back of it to accept a piece of fine gauge solder that simulates the steam line to the whistle. I the line originates in the funnels fore port side. I can probably dress that line a bit better.

And then it was time to add all the rest of the antenna systems. The SK's railing was a mess and was interfering with installing it properly. I trimmed away part of the funnel top plate and then re-arranged the ends of the railings to wrap onto the funnel. It's not great, but cutting the GMM rails in the middle creates a non-controllable mess with the three bars just flopping around. It doesn't work. And I've tried soldering another vertical post in the middle to give a shorter section. It didn't work, but it could. I just have to perfect it a bit. CA'ing the vertical is a non-starter. The 0.032" pins worked, but they were a bit of push into the holes which worried me that I might use too much force, slip and screw up several hours of work on those antennas.

The tri-mast went in without a hitch. And I added the piano wire guys to that top mast on that platform too. I didn't attempt to drill any tiny holes in the brass. All that would have done was break a $1.50 carbide tiny drill and probably destroyed some antenna or another, so I just placed them there and will led the J-B do its stuff. It's starting to look really cool especially if you don't dwell on all those twisted railings. When it's painted and rigged with radio wires and flag halyards it's going to be very convincing.

While the J-B was setting up, I started detailing the structure that sits directly aft of the island: a two-deck tower that supports a 40mm quad gun tub and director. My research shows a couple of vertical ladders, a WTD at the 2nd level, and a landing and inclined ladder at that door. I was having a time making the small platform, again because you can't really have GMM rails in half-sections. I get this finished tomorrow and show it.

  • Member since
    March 2012
  • From: Louisville, KY
Posted by Builder 2010 on Tuesday, February 27, 2018 5:25 PM

A pretty good day...

All work was entirely on the island. I added some Eduard small ladders to a step on the upper decks. Eduard PE instructions are among the best (if not the best) so I printed out their Essex set's instructions to use on this model. Their set is for the Ticonderoga, but much is very similar. I had these small ladders left over from the MO, but they were still too long so I cut them shorter.

I made some long platform railings using GMM's railing stock and some PE Fret brass from Tom's MW. I soldered the two together and then CA'd them to the island.

It should have been one long 8-section railing. I made a 4-section railing set and then checked my photos and realized that the catwalk went all the way to the WTD on the island side. I then made another 4-section piece. As it is, I would have had trouble soldering that long of a railing to that long of a walkway. There is a loudspeaker that goes right in the middle of that rail which will hide the joint between the two.

I changed the contour of the left most ladder way since it didn't allow a GMM inclined ladder to correctly sit. I took off part of the plastic rail and then widened the space and put a newly bent ladder in. This worked much better and cleaned up a mess.

I decided it was time to add the mizzen mast and its guy wires since it would take some manipulation and I didn't want any more stuff in the way.

I glued in the mast with thin CA and then back filled with medium CA. After it kicked, I built the outrigger out of 0.021" and soldered it using the RSU plus standard 60/40 rosin core solder, held in place on the soldering pad. It was an easy build and believe me, I needed an easy one. I cut the legs to length and drilled the funnel with a #75 carbide drill for the three legs. I angled all three holes to correspond to the legs' angles.

I glued the outrigger in with thin CA.

To hold the guy wires (high E guitar string - 0.011" dia.) I used a divider to space out their locations and drilled with a 0.0105" carbide drill. This drill is so small that if you pick it up the wrong way, accidentally touch the side of the drill, or drop the pin vise on your leg, the drill will break and disappear. It will also put a needle injury on your thigh. Ask me how I know...

I put a kink in the bottom end of the wire, fit it in the hole and then cut the length so it tucked under the platform on the antenna mast.

I used this length to approximate the length of the other foreward guy, and then used J-B Weld to glue them in place. I put a kink in the bottom of the rear guy so it would sit flat on the outrigger, measured its length and glued that in place also.

This all has to cure overnight. Tomorrow, I continue detailing the island and get ready to start adding the big assemblies before painting.

  • Member since
    March 2012
  • From: Louisville, KY
Posted by Builder 2010 on Monday, February 26, 2018 7:40 PM

The nice thing about scratch-building is that when you really screw something up you have the abilty and where-withal to make it again, and that's what I did with the mizzen mast. This time I formed the yard out of a solid piece of 1/32" brass square stock. I clamped the piece in a vise grip and ground the tapered portions with the 1 inch belt sander and then finished up by hand. The mast was made the same as the first on with one exception, I turned the base to be a tighter fit in the hole drilled in the funnel.

To solder the yard in place I clamped the mast to the solder pad and went at it with the RSU. Again it took 3 tries (at least) to get it centered and square to the mast. But this time, the solid bar without the PE was a bit easier to manipulate. That being said, I also soldered a piece of bent 0.011" guitar string underneath to act as a place to belay the flag halyards that go up to this mast. That piece of wire was a pain. It de-soldered a few times, got lost 2 times (made new ones) and finally got it to behave.

The first time I soldered it with TIX, but TIX seems to have a problem. If you get the joint soldered right the first time, it holds nicely. But if it breaks away and you try to resolder, it seems not to hold at all. I tried several times to get it to work, and then reverted the Kester soldering paste which is a higher temp solder. I was reluctant to use a higher temp since I didn't was to de-soldered the platform, or (and this would be worse) de-solder the radar screen. To help forestall this, I clamped a spring tweezers between the heat and the screen to act as a heat sink. It worked. It never de-soldered through these multiple attempts.

I added back the ladder and the base using CA to not tempt the fates and keep the soldered stuff soldered.

It looks kind of crude in this extreme closeup. Since it about 1/4 this size, and painted it will look okay. The Missouri's masts looked the same before they were painted.

Next up I'll be finishing up the railings and steps on the island and then start putting it all together prior to painting. Glad to have this mast finished. I wasn't happy on Friday.

  • Member since
    March 2012
  • From: Louisville, KY
Posted by Builder 2010 on Friday, February 23, 2018 5:44 PM

Thanks Steve!

I have only one picture today. That's because things went soooooo badly that one picture was all that was worth publishing.

It all started with trying to bend the stair treads on the GMM PE inclined ladders using an idea that was published on the Ship Modelers Forum. I found it searching to buy more inclined ladders since I was destroying them faster than creating them. I found that GMM sells a fret with just ladders. The idea to bend the steps didn't work on GMM or Eduard ladders, but was designed for Tom's which actually makes a provision in the etching to enable step bending. I did have some Tom's steps, but the fret was badly etched and the details were too thin a cross-section to permit adequate handling. 

In my searching for more inclined ladders to scavenge, I found a neat piece of Eduard PE that could be pressed into action as the outriggers for the mizzen mast. I drilled it to accept the mizzen base and then drilled it with a microscopic 0.015" carbide drill to accept .011" guitar string. Believe it or not, I did not break this drill and did drill both holes. Now that I figured out how to take really tight closeups, that guitar string looks huge. It ain't! The extra solder was deliberate to reinforce the Eduard etched bend lines since I wasn't bending those angle pieces as they should have been if used as the piece was intened to be use.

When I attempted to solder the mast into this hole, it didn't take. Furthermore, the yard arm detached. That when the proverbial stuff hit the fan.

As I messed with the yard arm, the PE laminate started separating and it was getting munged up pretty badly. I decided to remove the bad PE and use the other yard arm PE that I had. When GMM sent me the new main yard PE it was attached to part of the fret that also had the smaller PE yard arm. I soldered this onto the existing made yard and then went to solder it to the yard arm. Oh... and the ladder broke off.

Each time I attempted to solder the yard on the mast had a problem. They were (and could be more than one problem at a time):

  • Off center
  • Canted
  • PE not oriented correctly vertical
  • PE separating from the yard arm

I tried to put this together four times (at least), and of course, the PE was getting munged up like the first one.

Then I tried to free hold the assembly in the RSU's tweezers to just heat it enough to move the yard to the correct orientation, and the whole deal flew out of the tweezers. I found both parts. Then in another attempt to hold the mast in the tweezers since the platform at the top had re-melted and was now canted, and the mast flew out of the tweezers again, and the sound I heard from across the shop was the sound of a piece of brass entering the quantum rift. I wasn't able to find it. I'll find it where the radio tower ended up.

So now I'm starting all over again. This time I won't have PE to add to the yard, but I'll figure something else out. All in all, an almost totally frustrating day. You have them sometimes.

  • Member since
    February 2018
  • From: North Carolina, USA
Posted by Model Monkey on Friday, February 23, 2018 7:20 AM

Looking really good, both your Essex and your Missouri.

Enjoying your posts very much. Big Smile

  • Member since
    March 2012
  • From: Louisville, KY
Posted by Builder 2010 on Thursday, February 22, 2018 6:08 PM

Well... howdy! You can do PE without building brass masts, etc., but... and it's a big but... I'm trying to build a model that will stand the test of time and plastic masts with plastic cement can break down over time. I also find solder in small junctions has considerably more strength than CA. I do use J-B Weld when I can't solder and it's pretty trust worthy too. I also must admit, I am not a very good PE installer. I'm not really very steady. Thank goodness my son is... he's an eye surgeon. So I wrestle with it sometimes.

Today I built the mizzen mast and substituted a bigger radar system at the top. The one that was supoosed to go there was tiny and didn't go well. I have this sheet of miscellaneous WW2 radars from Tom's Model Works and took advantage of it.

I also built the secondary yardarm that goes under this mast. The mast is 3/64" brass rod, the platform was turned on the lathe and the ladder is from my left over Eduard set. The Eduard ladders as narrower and seem more prototypical.

I'm getting really good at making the hybrid yard arms. This was was a piece of cake even though it was a much smaller build than the main yard.

I added a soldered bushing on the mast's base to increase the gluing area and enlarged the hole in the funnel to accept. I enlarged it a little too much and glued in some plastic filler strips. I'm going to J-B Weld this in place when it's time to put it together. It also will have guitar string guy wires and will need an outrigger at the funnel's rear to accept the back guy. Similarly to what I did on the Missouri.

I started putting on the island's railings and of course, the inclined stairs got a bit beat up. The GMM stairs are particularly delicated and I kept bumping into the their railings. I'm running out of the Eduard version (a little more rugged) and am going to buy more of them. I also lost a few porthole eyebrows and one WTD. I'll go back and fix these later.

Tomorrow, I'll keep adding details...

  • Member since
    February 2018
Posted by JSamples on Wednesday, February 21, 2018 8:29 PM
Hey fellow Kentuckian. I new to the forums here. I also have the 1/350 Essex with PE set. I have no experience with PE and after following your build, I'm a little nervous about using it. I do plan on building other kits before starting on the Essex though. I have enjoyed reading your post and I have subscribed to it as well. Your pictures are very detailed and I look forward to future posts
  • Member since
    March 2012
  • From: Louisville, KY
Posted by Builder 2010 on Wednesday, February 21, 2018 6:04 PM

Thank you! I don't even want to think about 1:700. !:350 is about as small as ever want to get.

Life is good!

Last year I had a purchasing dream come true when my wife and I bought a genuine Herman Miller Eames Lounge Chair and Ottoman. We had purchased a knockoff 37 years ago that was completely shot and we figured it was time to get a real one. One of the buttons on the seat cushion let go and it was a warranty item. They picked up the chair five weeks ago and shipped it back to Grand Rapids.

Today it was back. In the meantime, I was using the ottoman with a wing chair. It was all wrong, difficult to have my laptop positioned correctly and made typing all this a pain. Unfortunately, the chair was shipped in a new chair shipping box strapped to a pallet and dropped ship in front of my garage. The driver said he wasn't permitted to bring it into the house. He helped me move it in the garage and out of the rain. I then had to unpack it, and heft it into the family room.

Of course I slipped on the cardboard as I tried to move it down off the pallet and fell on my left side with the chair on top of me. I was being impulsive. I could have waited for my wife to return. I did get it in the house. I am now sitting on it and loving it, and have a sore rib, but otherwise I survived. I'm annoyed at Herman Miller for sending the chair back to a residence without having it set up in the house expecting the home owner to unpack it, get rid of a pallet, and all the cardboard, especially when they had two fellows pick up the chair in the first place.

Onto the model. I continued adding vertical ladders, and inclined ladders and ran into a connundrum. The ladders are etched with the bottom slant perpendicular to the deck on which it should sit. It may be prototypical, but it makes gluing them in a real challenge. You're attempting to super glue the ladder in place with a single needle point contact area. It's very, very insecure!

I thought I was bending the railings wrong. So I kept trying to un-bend them and bend them the other way, only to realize after screwing up a few of them, that I was being ridiculous and that the etching precludes changing that bottom angle. It would be much better for us model makers if the tapered base was parallel with the deck thereby increasing the gluing area by an order of magnitude.

So here is today's work.

Oh, and the other thing I did was put the reinforcing plate in place and re-drilling new Tri-mast mounting holes to accomodate the new mast. Again, this isn't prototypical, but it was more importan to me that the mast be properly attached, and the side railings which go on next, will properly disguise the interface. In the above picture you can see the thickness variance I had to create so the new plate would settle over the kit's wings that had the original mast mounting holes. I actually used the razor saw to slice the piece horizontally to reduce the thickness at that spot.

It's interesting to note that with just this little handling to test fit the mast I caused deformation of some of the yard arm details. Nothing permanent, just annoying. Every time I touch PE I bend something I don't want to bend. Sometimes I wonder why I even do this stuff, and then I look at how fabulous ship models look when all the bells and whistles have bells and whistles and it makes all the aggravation worth it. Kind of like childbirth and raising kids, only more important. Boy... am I going to get slammed for that one.

  • Member since
    December 2003
  • From: 37deg 40.13' N 95deg 29.10'W
Posted by scottrc on Wednesday, February 21, 2018 10:05 AM

Hi Builder,

I am enjoying your build log and how you are doing the upperworks in brass.  The detailed photos your are taking is helping.  I am about to start the Lexington, but in 1/700.

  • Member since
    March 2012
  • From: Louisville, KY
Posted by Builder 2010 on Tuesday, February 20, 2018 7:02 PM

A reader on one of my other forums that I post this build suggested that instead of trying to re-finish that ruined island side, that I should laminate a piece of thin styrene to re-create the surface and get a fresh start. I thought this was a terrific idea and executed it.

I started by measuring the key dimensions and then creating a cardboard template and then transfer this to 0.010" styrene. It slipped under the angle brackets under the gun tubs and fit flush under the 2nd level gun tubs. Before installing I scraped off all the details and would replace all of them with 3D pieces.

Here's the cardboard fit onto the island.

The styrene was thin enough to wrap around the ends. I didn't like the seams on both ends anyway so covering them would be a plus. I would shape and fill the wrapped end on the other side. I used liquid cement to make the joint.

With a nice clean surface, it was time to add all the details. I located the WTD locations prior to applying the laminate and then marked those locations on the new surface. I have a new way to apply PE details. It consists of using a white, Japan-made, special "pencil" (well... it looks just like a pencil) that gently holds PE for placement. A slight twist after the CA glue sets releases the part from the pencil. The other is using Gel CA. It sets much slower, can be applied in a tiny dot that stays put, and gives you time to move the part around to align it. I previously used thin CA. While it set fast, it was almost unmanageable for me. Brian Bunger, the owner of Scale Reproductions, told me to try thick CA. What a difference!

I not completely happy with the hole I made for the open door. It's a bit ragged, but if I want it much smoother the hole would keep getting bigger and it's alrady about as big as it should be. I suppose it could be a little lower, but not any wider. I scribed lines for the portholes and doors so they would line up nicely.

You will also notice that I actually put eyebrows over the new portholes. I decided to try this and it worked pretty well. I first formed a coil about the right diameter using a round parallel jawed pliers that I bought from MicroMark. After forming the coil, I cut them apart with the flush cutters and then used the placing pencil to put them over the portholes. I also started replacing eyebrows ground off when I was doing all the filling after making the Flag Bridge mod. When I put them over the two ports in the flag bridge front, it turned out that the right side was canted towards the right and the left towards the left and it looked like the face of Wall-E. Too cute! So I had to redo it. For some reason, that redo took as much time as putting on the seven on the flat surface.

This small gauge brass wire is the fancy birds nest of twisted wire on the top of some Spanish Rioja wines. Besides being a good red, the bottle provides some added value, first with the wire, and then the foil which is also great scratch-build material.

So... it's not that you screw up. I do that plenty! It's how you recover. It's the same in restaurants, and in business of all kinds. Stuff happens! Good recoveries is where you shine.

  • Member since
    March 2012
  • From: Louisville, KY
Posted by Builder 2010 on Monday, February 19, 2018 5:12 PM

It was a great Sunday, but it could have been a disasterous Monday. Yesterday, when I took that last photo of the tri-mask posed on top of the island, I had an open bottle of Tamiya liquid cement behind that white cardboard backdrop. I had pushed the backdrop not realizing the cement was behind and tipped it over... forward.

When I got down to the shop today, I found the island solidly glued to the Corian work surface on my auxiliary workbench. Other stuff was glued down also since there must have been dissolved styrene in the glue. It was all dry so I got a razor blade and pried the island off the bench. I scraped all the remaining glue off the Corian. The cement does not attack Corian. Had it, I wouldn't have been able to separate the island from the bench... small blessing.

The glue melted and distorted the port side not quite up to the next deck level. It caused slight fissures and other distortions. I wasn't going to replace all the molded-on WTDs, but now I was forced to... another small blessing. I scraped all the doors off, and then filled the surface with Tamiya putty. Kind of poetic...Tamiya glue did the damage-Tamiya putty will fix it.

I did other stuff while the putty set and then sanded it off down to a level surface. I'm sure that it's still damaged and will probably shoot some primer on it to highlight the surface and then re-fill.

How the filler appears sort of shows where the damage was. It's miracle that the whole thing wasn't wrecked which either would have scraped the entire model or left me another very challenging scratch-build project. I probably could do that, but sure didn't want to.

While it was curing I built the lattice structure under the exterior elevator. Unlike the horror of the island disaster (and I'm not talking about Puerto Rico), the elevator went together perfectly. There are 6 PE trusses and that's covered with an elaborate lattice plate. The plate needs to be folded to conform to the trusses. I needed a template.

The easiest way I could think of was to put the PE Fret on a piece of white paper and lightly shoot some rattle can primer at it leaving a silhouette on the paper. I spray glued the paper and put it on some card stock, and cut out one of the images with a razor knife. I used this to get the fold angles right which really helped in the getting it on the trusses.

The trusses were CA'd to the styrene elevator. It was finicky, but went without any complications.

like the rest of the PE on this model, I try and solder brass to brass whenever possible. In this case it was the perfect solution. I tinned the lattice frame on all the vertical members for their full length, not knowing how much melting I would do.

I carefully put some TIX flux on all the truss edges and placed the lattice on top. Setting the RSU at about the lowest setting, I handheld the lattice on the low edge and got it aligned on the end truss and then, using the RSU tweezer handpiece, lightly (very lightly) held the two pieces together, hit the foot switch and released it as soon as I saw a puff of steam from the flux vaporizing. That took about a half second. It was almost instantaneous. Held any longer and it would have burned through both peices. 

I then went to opposite end's truss and did the same thing. To solder the narrow end, there wasn't clearance to get the tweezers in so I used the Weller iron and pressed the piecees together while I stabilzed the other end. With the ends done I went back with the RSU and did all the other trusses at their top ends and middles and used the iron for the bottoms. This whole activity was very quick and it's quite solid. I am relying on the CA to hold the trusses to the elevator, but there's a lot of pieces sharing the load.

It looks really nice and complicated. I would have hated to try and get that lattice to work with CA. Solder doesn't screw around.

I also did a small job; put the PE screens on the funnel outlets with CA. I need to make a couple more minor antenna sets and the small rear mast which I believe is also where the American Flag is displayed. These will be brass too.

I was getting ready to finish up all the railings on the island and now I just have to do some more stuff. I may remove the molded on piping and add real materials. 

  • Member since
    March 2012
  • From: Louisville, KY
Posted by Builder 2010 on Sunday, February 18, 2018 5:40 PM

Well guys... I had and even rarer Sunday work session, and what a good session it was.

Instead of the two miserable hours building the first Mark 37 director, I got the second done in less than an hour without any hassle. Frankly, I should buy two sets of PE for every ship model I build; one for practice and one to actually make into a model. I added the ladders and WTDs to both and gave then a shot of Tamiya primer just to get an idea of how much of the yucky stuff was now hidden.

And here are both directors ready to go onto the island.

These are now set aside. I just looked a Trumpeter Essex on Pinterest built by a fellow from Singapore and he got all the extra bits onto those directors. I imagine he's a much younger person with much steadier hands. I've gone as far on these as I did on the Missouri and they look pretty good on that boat.

Next up was completing the tri-mast with the replacement yard arm PE sent to me by Loren Perry. Again, having a practice piece where I found out what was going to be a problem paid off. I was able to nail this one without a hitch.

The first thing I did differently was get the lenght of the made yard arm dead on. It's a telescoping assembly of Albion metals super-tiny thin-wall brass tubing. The inner is .4mm, then .6mm and finally .8mm. I didn't solder both ends, just one side to keep the tubes in place.

The next thing I did was file a nice flat onto this assembly to give good solder surface.

Finally, and the most important thing, was to do all the soldering of the PE to the yard while the PE was still flat and attached to its fret. I first tinned the two parts with a very thin film of solder. For those of you who aren't familiar with how solder works and why it's so strong is this. Solder actually infuses into both substrates. It forms a metalurgical bond, not just a physical one. Glue creat a physical bond to non-porous surfaces so solder is much, much stronger. And since its the metalurgical bond that provides the true strength, the thickness of the solder actually weakens the joint. More is not better.

I didn't want to fill any of the signal halyard eyes or other fine detail, so I was very judicious about the amount of solder I was applying. I used TIX liquid flux for all my metal soldering jobs even if I'm not using TIX lo-temp solder. This was done with the Weller soldering iron with a small chisel, not pointed, tip.

I then used the RSU to hold the made yard over the extreme end while aligning the other end with my fingers. The RSU heats so quickly that you can hand hold parts an 1/8
 away before it gets too hot (it depends on the mas of the metal you're heating of course). When that end joined I moved to the middle and then the other end. When it was settled in I went back and hit some intermediate locations.

The end result was a solder, true yard with no distortion and none of the details screwed up. Here's a comparison of my test piece and the finished one. Really makes the case about having two sets of PE, doesn't it.

The next step was to get this onto the tri-mast without messing anything up. I placed the yard under the platform with the yard braces tucked under the platform between the brass brackets and marked this location on the rear two mast columns with a fine-tipped Sharpie. I then, using a small diameter diamond coated cylindrical burr, ground a couple of cicular divots so the yard would have a positive location into which it can settle. I then tinned these divots with TIX solder. I didn't want to use 60/40 becasue the melt temp is too high and I run the risk of de-soldering anything.

I again used the RSU to clamp one side against that column and aligned the other side with my fingers and hit the foot switch. It heated quickly and melted the tinning and joined. Then I did the same to the other side and the job was done.

After I took the pic I rotated the two weather vanes to face into the wind, and set it on the island to admire how it looks. There are a couple of very small antennas that go on those straight stalks sticking up. They're pretty fragile and I'm going to wait until this is on the island before installing them.

There's the whistle platform to build, and a small mast and yard mounted to the aft of the funnel which I will replicate this yard making method and build that one. That yard is shorter and has less bulk so I'll build it out of the two smallest size of the tubing. Then I will start adding open WTDs (there are four in the GMM set) and all of the ladders I had scraped off the kit island. I need to add loads of little railings and a few inclined ladders, and then add in all the radar sets. I'm thinking about doing as much super-detailing of the island BEFORE I put in on the ship. Most of the rigging stays on the island. There are some guy wires that need to be installed on some of these non-lattice masts.

Again... it was a good Sunday!

  • Member since
    March 2012
  • From: Louisville, KY
Posted by Builder 2010 on Saturday, February 17, 2018 5:36 PM

Had a rare Saturday session. The weather was disgusting and it was a good day to do some more work. I also did one hour on the bike and elliptical so I don't feel too guilty. I spent almost 2 hours building ONE Mark 37 gun directior. This time I decided to try the Tom's Modelworks bracket and screen since it is a bit more robust, doesn't have etched bend lines and I have 8 sets of them. Unfortunately I don't have any extra lower bases. They were all consumed in making these things for the Missouri build, and I went through a ton of them.

I say unfortunately becasuse the front bent leg of the base finally fell off after about four resoldering sessions. So the base has three legs. You can't really see it, but it certainly has less structural integrity.

To reinforce that critical mounting lug, here you can see the piece of square cross-section brass rod that I soldered to the lug.

Again, I wanted to solder everything. It's forgiving (to a point) and if something isn't quite right you can re-position it. That being said, it was the constant attempt to get everything right that caused most of my troubles today. I wanted to get the radar reflector properly captured in the tips of the bracket. I had to solder and re-solder probably 5 or 6 times before it was right. And that was not just doing the soldering. Other bad things started happening the more I screwed around with it, including, the lug separating from the block, the base de-soldering from the brass plate (twice). Then I wanted to add the side parabolic screen. The first time I soldered it, it was off-center. The second time, sticking out too far. Then the screen detached...and so on for two hours.

I finally reached the point when I could CA the little IFF antenna that sticks out of the middle, and then the side antenna's lug broke when I attempted to file the brass plate to get it to conform to the plastic unit below it. I then soldered it on directly to its side with no reinforcing lug. And it was done. I may put a tiny bit of filler around the brass plate if I can do it without wrecking the whole deal. I've been known to do that... attempting to do just one more thing... and then it hits the fan.

There are still some more details that go on the director including a couple of ladders and a WTD in the base to let people get into the housing. Next session (Monday), I build the second director. I would like to think the second one will go easier than the first and this is usually the case, but not when messing with PE.

  • Member since
    March 2012
  • From: Louisville, KY
Posted by Builder 2010 on Friday, February 16, 2018 7:37 PM

Thanks for the moral support! It's what I like about this community of thinkers and doers that represent folks who build stuff.

I like to post the details; I like how people react to it and it's cathartic for me helping me process what's going on and giving me more ideas.

Today was a mixed bag. I actually finished the two main radar systems, shot them with some primer and put them aside someplace safe. First I got the SC antenna assembled. That required a bit of fussind and annoyance. I needed to make the base for it. It needed a hole to capture the piece of brass wire that serves as a mount for the screen. Here's how I build that pin attachment that I noted the other day. 

I flatten the end of the brass wire in successive steps in the flat jaws of a vise grip. I've used this trick to make all kinds of flat/round brass transitions. I then drilled it with a 0.032" drill and soldered it to the un-bent PE platform. I left the bending of them until the soldering was done.

I tried the Kester soldering paste for these kinds of jobs and it does have an advantage in that you can lay down a thin film of it, it alredy has flux and melts at a reasonable temperature. It really stiffens the little platform and the pin is terrific for both attachment and holding the assembly while working on it in a pin vise.

I made the mistake of fastening the screen and it's fragile backing frame onto the unit before I got it mounted on the pad. I also thought that the tiny PE ring that was part of the backing had the same diameter hole as that in the top of the lattice tower. IT WAS NOT!. It was smaller and when I tried to insert the support pin into it, the back frame popped off. I J-B'd it, and should have soldered it.

I attempted to get it back on again, and then it got lost again. It's now not on it and good riddance. I left that pin long and soldered the screen directly to it. That screen ain't coming off.

I put the lower pin through the hole that was continued through the platform and then soldered it from below. Oh... and the circular platfrom came loose when the heat got to it from the soldering of the screen. And the circular rail separated from the platform too. I got it all back together, resoldered the rail to the platform and CA'd the platform to the tower. So here are both major radar installations waiting for attachment to the island.

Some of the fine detals got filled with solder, J-B and paint, but from two feet away it will work. I know... the Missouri has similar flaws.

Next up was the Mark 37 gun directors. These things gave me fits when building the Missouri and based on how it went today, they're going to give me fits again. Part of the problem is my ham fisted handling and the other is the geometry of the modeling of this somewhat delicate full-size structure. The big radar on top was supported by a rather insubtantial tubular frame. The main frame juts out at an angle and is not simply supported directly underneath, and then you have the twin parabolic reflectors and other stuff attached to them. 

I went through a full set of Eduard PE and then Tom's modelworks PE before I assembled the four MK 37s on the Missouri. At least the Essex only has two. 

Before starting on the PE I built the plastic bases from the kit and then created a holder for them so I can add details without them moving all over the place. The base turned out to have a diameter of almost exactly 5/16". I drilled a piece of scrap and stuck the pieces into it. There were a bunch of other blind holes in this block since it's used as a drill press block so I taped them over so little PE bits down get lost in them. Then I had the idea to add some tape turned back on itself to act as "PE Flypaper" and catch dropping PE.

 Here are all the GMM bits that make up the radars for the two directors.

First the pluses. The base PE is good because GMM didn't etch the bends and reduce its strength. Not only did I bend it, but it got unbent, re-bent, bent again, etc. and didn't break. That was a good thing.

After bending I tried it on the top of the director and realized that the very small contact area didn't bode well for using CA to hold it down, but I couldn't solder to plastic. So I cut a thin piece of brass and shaped it to the same size as the director's roof and soldered it to that. It's strong! I will CA the brass plate to the director after all of the rest is built.

The PE flypaper was a non-starter and was more trouble than it was worth so I pulled it off.

I folded the GMM upper mount and then attempted to solder the little tab onto the flat part of the lower mount, and couldn't hold or get an angle that let me solder it any way I tried. It was also very flimsy and kept bending and deforming no matter how careful I was. I then turned to two left over Eduard upper mounts. These are much more detailed and realistic than the GMM, however Eduard DOES etch their bends and this comes back to bite me. I got the lower mount soldered to the frame successfully and then got the upper soldered to the lower in this hybrid deal.

I also soldered the sides of the frame so the arms wouldn't keep spreading. So far so good.

I'm not happy with the blotchy solder. That was the result of using the paste and having the plate not receptive evenly across its surface. I'll do better next time. Paint will hide some of this.

Then it was time to make the parabolic double screen. This is a Eduard part also and therefore has those etched bends. The first one I bent fell into two pieces are that bend line so I worked it as separate pieces. Then suddenly... they were gone. Somehow they both got off the t-shirt and into... what?... the floor?... not this floor, at least not in a 25 square foot area. Quantum Rift again!

So I bent the second and last set I have. This time it didn't separated into two. I decided to solder this also since it's an awful CA job. Got it all soldered, and then disaster strikes.

That joint kept breaking when doing the Mo and it broke again. This picture clearly shows the difference in sophistication between Eduard and GMM. I've got some ideas about how to fix the broken support tab by reinforcing it with a piece of solid square brass stock that will be soldered into the crotch of the joint and it won't break again. I also have Tom's Modelworks PE MK 37s and will attempt those if I can't find those lost parabolic screens.

I've taken thousands of pictures on models with my iPhone and never realized that the telephoto method of finger-pinching that's used to do telephoto normal pictures, also works at doing macro photograhy. I found it by accident today and went "Whoa! What was that? How did I do that?" I played with the phone and found that I could take dramatic ultra closeup pics like the above.

I also found that my old Missouri still had it's horn and it will now be re-purposed to be the horn for the Essex. 

I'm glad I found it since I didn't really want to scratch-build this. The GMM set has a PE whistle platform. Now it has a whistle to go on it. That old ship has done noble duty giving up its pieces for better projects.

  • Member since
    December 2010
  • From: Salem, Oregon
Posted by 1943Mike on Thursday, February 15, 2018 11:08 PM

Builder,

It's not always relaxing! It can be frustrating, anxiety provoking, and, on occasion, lights up the neurons between your amygdala and prefrontal cortex that switch on angry emotions along with the urge to break the work you've been doing into many, many irretrevable tiny, broken parts Super Angry. Ask me how I know this Big Smile.

But, that having been said, it's usually a very satisfying experience for me to see the results of my labor take the form of a reasonable facsimile of what I'd thought I wanted to build.

You, however, seem to be more demanding of yourself than most in this hobby. I empathize.

I don't try to scratch build anywhere near the parts you do. I am a "hack" at this hobby but I do enjoy it most of the time.

Your kit is coming along with amazing detail and I certainly appreciate your running dialogue on the process. Sometimes PE is bent beyond repair. Sometimes it's best to do what you're doing - leave it alone. And sometimes I would just spring for another set of PE. That's because I don't want to have a stroke trying to beat a ruined piece of brass back into shape. I just don't have the skill. You probably do have the skill. Your choice - your wallet.

In any event, I enjoy checking in on this thread. I believe you're an exceptional modeler and, in the end, you'll make things work.

 

 

Mike

"Le temps est un grand maître, mais malheureusement, il tue tous ses élèves."

Hector Berlioz

  • Member since
    July 2010
  • From: Tempe AZ
Posted by docidle on Thursday, February 15, 2018 11:05 PM

Builder,

Even with all the trials and tribulation, this is a great WIP. As for the PE damage, you can always go my route and call it "authentic" battle damage!

Steve

       

 

 

  • Member since
    March 2012
  • From: Louisville, KY
Posted by Builder 2010 on Thursday, February 15, 2018 5:42 PM

Another day resolving catastropes. Some days I wonder why I punish myself like this. It's almost as bad as my attempts at playing golf. I did it for years and only got frustration. It was that kind of day.

It all started nicely. Since yesterday's J-B work was now solid I added the railing around the SK platform first forming the curve around a piece of brass. I attempted to use thick CA to glue the railing to the platform since I was afraid of un-soldering the angle brackets, but this wasn't working so I bit the bullet and soldered the railing in place. It worked!

I used J-B to glue the radar assembly onto the upper parts of the mast. I then set this in a vise on my secondary workbench and all was well with the world.

I then went back to the SC antena tower. It too needed a radial railing on the work platform and GMM included a specific piece of rail at the right length. I soldered the ends of the rail together and then soldered the rail to the round platform. If you look closely you can see the SC antenna with it's backing glued on with J-B. I added a piece of 0.032" brass rod through the hole on the top of the lattice tower, and extended the rod through the bottom so it will serve as additional support to the final assembly.

I also added the long ladder on the tri-masts vertical leg. First I tried to get it in place with J-B, but was having trouble so I soldered this also and didn't un-solder anything else. Then castastophe struck.

I was in the process of making my own yardarm in preparation for the new PE to arrive from Loren Perry at GMM. He found a spare Essex yardarm detail and is sending it to me for the price of the postage. I assembled the new yard out of three peices of very fine telescoping tubing. As I noted yesterday, a close inspection of the real yard showed a circular cross-section. Again, I soldered the three pieces together and then chucked the rod into my Dremel and files the joints smooth.

The smallest tub, which I believe is .5mm, has a hole in the middle that I wanted to fill with a piece of fine guitar string. So I attempted to find my piece of High E guitar string in a plastic container on the shelf over my work bench. There is a corollary of Murphy's Law called "the law of selective gravitation" that says that anything dropped will cause the most amount of damge". It came about from NASA when a wrench was dropped while making a space satellite and caused a million bucks worth of damage. As I moved the box, a bottle of MicroMark Pressure Sensitive Adhesive fell off the shelf. It landed on the plastic container that held some of the finished PE peices like the five long range radio towers. 

The box exploded its parts in every direction. I was able to recover all of it except for one radio tower. I simply can't find it anywhere. And believe me I've looked everywhere.

I'm hoping it will come back from the quantum rift tomorrow. Otherwise, I'm going to be building an Essex with only four of the five antenna towers. It might be a blessing in disquise since I have one wrecked base for them. But that wasn't the worst thing that happened!

I pushed my roll-around auxiliary work bench out of the way to search under it for the missing tower. In the process of pushing it, I must have contacted the vise that was holding the SK antenna assembly with the curing J-B. I had pushed it backhand not looking at the bench when I did it. Big Mistake!

When I next noticed the assembly, the SK antenna was no longer on the mast. I found a mangled back frame on the bench nearby and the antenna facing on the floor. This was J-B'd yesterday so it was cured, but now fractured. I spent a long time, re-forming the back frame, cleaning off all the J-B and getting it ready to reattach. I decided to solder the back frame to the facing, and it worked. Incidentally, I ordered and just received a solder paste and dispenser from Kester (Amazon) which will make it easier to precisely add solder to these micro-assemblies.

I then attemped to solder the antenna to the mast after cleaning off the un-cured J-B. This was a solid brass rod and the heat needed to tin the piece melted the J-B that was holding the mast to the PE base and it fell apart. The soldered railings and brackets DID NOT LET GO. So at least that worked.

I made a new mast, this time out of 1/16" tubing, not solid, so it wouldn't take so much heat to tin. I decided to solder the antenna to the mast first and then J-B the new mast back onto the platform. Meanwhile all this handling distorted the railings and brackets at least three times, and the round platform also broke loose (it was CA'd), and I put that back on after soldering the antenna. The antenna soldering worked also, I re-glued the new mast to the platform so it is again curing overnight, only this time it will be a complete assembly.

Whew! I'd like to say this stuff never happened before, but I suffered similar trials when building the Missouri. I rolled over SK-2 radar assemblies with my desk chair wheels and had one of the main gun director radars darn near destroyed when a piece of white cardboard (which I was using as a clean photo background) fell forward, hit the radar and crushed it. It was the last one I had and I re-formed is as best as I could. Stuff happens!

You can see some of the fine screen details have been filled with solder (more reason to use solder paste from a precision dispenser). And those railiings have taken a beating. I'm going to leave it alone... I've done enough damage already. Hopefully, tomorrow will be less eventful. This is a hobby and is supposed to be relaxing. Yeah! Right!

  • Member since
    March 2012
  • From: Louisville, KY
Posted by Builder 2010 on Wednesday, February 14, 2018 6:06 PM

Short session, but made a couple of steps forward and a few backwards.

I adhered the SM-1 antenna assembly onto the platform using thick CA. I opted for this since I wanted it to cure fast. It's holding nicely. Sorry about the soft focus. My iPhone isn't so hot with macro photography. 

I added the ring plartform onto the SK mast using thick CA. I then needed to build a round railing using the GMM 2-rail style railing. I calculated the circumference measuring the ring platform and then multiplying by Pi (jr high math at work), cut the rail a little long to allow so overlap for soldering, and cut it from the long length on the fret. I soldered the ends with about a 1/32" overlap. It was the only way to ensure that the ring rail stayed closed.

I decided to solder this rail to the platform too. And I'm glad I did as I will regale you with. I'm finding a problem with my work... I tend to get myopic... I focus so intently on the tiny little spot upon which I'm working that I don't realize that how I holding the assembly is deforming some other aspect. The angle supports under the platform weren't doing so well and started to break away. I needed to attach them again. Sodlering was the way to go. As I was handling the assembly I realized that I had pressed against the rail and it was getting a bit weird. Becuase it was soldered it didn't break loose, just changed shape. I was able to massage it back to a reasonable circle. Ain't great, but it will be okay.

I cut the angle supports off of a platform style that I'm not using and used them to replace the original ones that were breaking away and badly deformed. It took a little playing around to get everything into position since the actual edge was only 0.005" wide and I had to try and hold it steady enough so the solder would solidify. I couldn't use the RSU since there was no way for the tweezers to get a purchase. And then the vertical posts J-B Weld broke loose when I bumped it. I re-glued that and will let it sit overnight. Having the brass pin was a god send since it allowed me to hold onto the assembly without depending on the thin PE platform. You can clearly see the pin in the jaws of the hemostat. That pin will go into a drilled hole in the funnel and will be epoxied for security. Those angle brackets will be for decorative only.

There's two more things to go onto this very small assembly: a railing around the platform proper and the SK antenna. The last thing to go on will be the antenna, and the it will go somewhere for safe keeping until it goes on the island. I can't solder the railing since any heat of any kind at that edge will de-solder those angle brackets. I'll J-B it.

Last thing I did was J-B Weld the lattice platforms back into the crotch of the tri-mast. This too needs to sit overnight. There's a long ladder which goes up the center leg that needs to be added too.

There will be some careful cleanup of the excess J-B. Paint will hide a lot of the funny looking surface you're seeing (I hope...). You can better see the SM-1 antenna in this picture. I attempted to get the dipoles on (again!) and lost them again due to the same myopic work habits as I noted above. I have to be more conscious of how I'm grasping these fragile assemblies to prevent damaging previously attached things. They're so fragile that you can't feel when you're applying too much pressure. The parts deform and then you see it.

Slowly, but surely, I'm getting all this finicky stuff under control. It does tax one's patience that's for sure.

My mast leg spacing does not conformd to the ship's holes. I'm going to shave off those bosses and then add my own doubles to add more meat for the mast legs to get good purchase.

  • Member since
    March 2012
  • From: Louisville, KY
Posted by Builder 2010 on Tuesday, February 13, 2018 8:27 PM

The J-B Weld worked perfectly and created strong, unobtrusive joints for both the railing and the top search radar screen. With this new found confidence I decided to build the next radar; the SP radar that would go on a mount at the front of the tri-mast platform. 

This is the instructions from GMM. I chose to do #1 (first...more about that later).

The spider in the back gets dish shaped. I turned a tool in brass to press in the shape. I have a spherical turning attachment on the TAIG lathe which is very handy. After cutting out all the tiny parts I pressed the tool into the surface of my soldering pad to make a corresponding dish impression, and then flormed the spider. I first tried to glue the spider to the frame using thick CA, but it wasn't working well so I switched to J-B Weld. 

This is kind of what it looked liked. I looked better in person.

I had it sitting on the bench above the belly board where I do most of the work in this location. I then needed to turn the conical base for this antenna. The instructions showed a full-size image of this scratch-build part. It was .150" o.d. and I turned it down from a piece of .250" brass rod using the compound slide on the lathe set to the cone angle. For  the top machinery I just soldered some brass pieces to it to provide a mounting point for the delicate antenna. 

I measured the ladder distance so I could cut some off the the ladder stock included in the basic fret and then cut and formed the ladder ends to wrap around the mast. I used thick CA for this gluing. I glued the top mast and the antenna mount using J-B, and started another antenna project, making the mount for the SK antenna.

This mount consist of a piece of 3/32 brass mounted onto a small triangular platform that has very fine (and fragile) triangle trusses underneath. I do not trust this flimsy truss to have any real structural strength to hold up the antenna, so I added a piece of 0.032" brass wire soldered on the bottom with a long pin sticking out that will go into a hole in the funnel. There's a similar bracket holding the aft mast on the Missouri and I know in my heart of hearts that this is the joint that will break loose if I move that model too much.

I J-B'd (new verb) this mast to the platform after sticking the pin into the side of my soldering block. This needs to cure overnight. A railing needs to go around that platform. That's no something I'm looking forward to.

I flattened one end of the brass wire using a vice grips so it had a nice broad contact area. As it turns out, the resistance soldering tweezer make contact with this very thin brass truss and vaporized a bit of it so it couldn't support anything anyway. I'm going to add brass pins to all of these cantilevered platforms since the SC-2 radar hangs on one of these on the other side of the funnel.

I also build two more long-range radio towers and they continue to break out of the fret, and then built the SC-2 Radar lattice mast. Like the other lattice structures, I soldered these joints, not CA'd them. The round platform is CA'd since it has a lot of contact support. There is a railing that goes around this platform. That's going to be fun...

 

While I doing all this other stuff. That fraglile SP antenna somehow got picked up? bounced? or somehow moved so it was now on the t-shirt on the belly tray. And it was no longer structurally intact. So I reglued it and had it sitting on that piece of black plexi in front of me. I moved something else and then it was gone! I mean really gone! Not on the t-shirt, not stuck to my lab coat, and not on the floor anywhere in the vicinity I was working. Into the quantum rift.

So I built the SM-1 antenna to mount. It's no longer chronologically correct since the SP was used late in the War which is when I'm modeling. The rivet counters will have to forgive. This antenna (#2 antenna on the drawing above) is a challenging build since it has a 8 piece spider behind and it's really, really, really tiny. I got the back frame together, and attached to the screen, and then got the three filigred dipoles on. I went to mount the antenna to the base now curing on the tri-mast platform, but found this to be "sub-optimal" to say the least. I removed the base since the J-B hadn't cured much at all, and then prepared to J-B the screen to the base. Of course, all those delicate dipole attachments came off. I'll attempt to get them back on when the J-B cures tomorrow. And if I don't it still looks infinitely better than the plastic ones it replaces.

To hold the base to the backing I held the base in a hemostat and then let it rest on the screen. I got it positioned well so it should cure okay... famous last words. You can tell just how small this stuff is looking at the looming size of the hemostat.

I'm going to fabricate a new main yard. I looked at some more photos and it looks like that yard was actually round. I have some very fine telescoping brass tubing that could work okay. Loren Perry is sending me a replacement of the brass yard for just a shipping charge so I'll be able to affix a good PE part to the stronger yard. I should be able to finish up the tri-mast tomorrow. I'm concerned that my leg spacing seems to have narrowed. I don't know if I can make it wider without wrecking everything I've done. Sometimes you have to know when to stop.

JOIN OUR COMMUNITY!

Our community is FREE to join. To participate you must either login or register for an account.

SEARCH FORUMS
FREE NEWSLETTER
By signing up you may also receive reader surveys and occasional special offers. We do not sell, rent or trade our email lists. View our Privacy Policy.