WIP BLOG and Finish photos are here: https://imgur.com/a/2GfFk
Thanks, Terry. The track links weren't really a problem to build. The fit was tight and casts were clean.
I just did it by gluing together ten links at a time until I had the whole run assembled (113 links per side). Then carefully put it around the wheels and connected the ends, let dry.
(edit: I originally wrote 75 links per side but corrected that to 113 links per side)
Supplies I used: two lengths brass square stock, weight, liquid cement, flat bench top.
Dry assemble ten links at a time, then glue together by wiping a fully charged brush across the length on both sides of guide teeth of this surface.
Straighten this length as I went along by placing weight onto one brass stock, then push the track against it and push the other brass stock against the other side to straighten.
Once the length that I'm working with is straight, I flatten it by placing the brass stock on top like this. Then place weight on top of the whole thing.
I did this each ten link time for about one minute each, until I had the whole 113 link length complete. The glue didn't cure yet so was still able to articulate around the running gear.
(edit: I originally wrote 75 links per side but corrected that to 113 links per side)
WIP BLOG and Finish photos are here: https://imgur.com/a/2GfFk