Made some more progress on the boat deck level. The next element that needed attention was the admiral's walk. I immediately encountered an issue with its fit in relation to the admiral's day cabin and the little box on the other side of it. I'm not sure if this was a combination of using the Eduard replacement for the cabin, a fit issue with the kit part, or some combination/variation of the two. Regardless, I needed to modify the walk by cutting a notch into it so it could clear the box, part B6, which the instructions have you install in Step 22 prior to the walk going in. I also added the side sponsons (B8/B11) to the walk instead of installing them directly to the superstructure sides as I wanted to sure they would fit flush with the walk and not cause issues. Last but not least, I also added the supports, F23, that the instructions would have you install independently in Step 26. That's not a good idea as they have to attach at an angle and getting that right is pretty difficult without using the walk itself to ensure they sit correctly.
While the walk supports were setting up, I added the PE access ladders from the super deck up to the boat deck and worked on the aft searchlight platform as well. I found an error in the Eduard railing PE instructions, the correct railing for this area is #12, not #4. #4 gets used on the small searchlight platform on the main mast and is too small to go in this area, so a small note for anyone looking to use that set! I used the small section of railing that I clipped off from the fire direction control platform earlier as the back railing section for this platform, installed the front railing, then added the pair of searchlights to complete the aft portion.
Then the real fun began in terms of the railings for the admiral's walk because of all the complex curves involved with it. I opted for the Eduard rails instead of the Trumpeter railings as the Eduard railings have the correct lower height vs. the Trumpeter railings which are all the same standard height type and the Eduard rails have the added bonus, at least for the inner rail, of having etched bend lines to aid with the shaping of some of the key areas around the searchlights. I added the inner railing first, then added the 4 search lights, then the outer rail came last. The forward pair of 12 pdrs rounded things out as well.
Next up will be working on the bridge components so I can get them integrated in fully in with the rest of the superstructure.