got the holes filled for the lost front slope tow cable, external fuel drums on and added the plumbing and some fuel spill oil washes and the side skirts. ready to start the base and the powder/pastel weathering. i REALLY like the way the oil washes worked; good 00 and 000 brushes, q tips and 4 hours of patience. very relaxing. ha Russian Symphonies in the background. if i had been any more relaxed i would have fallen asleep. will post pics on Thuts.